InstallatIon InstructIons  

Pergoline

2.8.     mounting railS anD PoStS









Profile edge

• 

If necessary, adjust the height of the posts to the 

 

 

situation on site. For this purpose, shorten the post  

 

profile on the side opposite the pivot. 

• 

Demount the cover of the guiding rail.

• 

Insert the pivoting bearing with the clamping plates in  

 

the guiding rail. Ensure that the acute side of the post  

 

profile points forward. If required, slightly fix the pivot. 

• 

Insert the post profile with the pivoting bearing into the 

 

 

base plate.

• 

Re-install the cover of the guiding rail.

Art.-Nr.: 930059    © by 

WO&WO

   

Literal mistakes and technical changes excepted

   

Valid from February 2010

    

Page 8

InstallatIon InstructIons  

Pergoline

2.8.     mounting railS anD PoStS









Profile edge

• 

If necessary, adjust the height of the posts to the 

 

 

situation on site. For this purpose, shorten the post  

 

profile on the side opposite the pivot. 

• 

Demount the cover of the guiding rail.

• 

Insert the pivoting bearing with the clamping plates in  

 

the guiding rail. Ensure that the acute side of the post  

 

profile points forward. If required, slightly fix the pivot. 

• 

Insert the post profile with the pivoting bearing into the 

 

 

base plate.

• 

Re-install the cover of the guiding rail.

 

2.7. MOUNTING RAILS AND POSTS

 

 

•  If necessary, adjust the height of the posts to the situation 

on site. For this purpose, shorten the post profile on the side 
opposite the pivot.

 

 

• Demount the cover of the guiding rail.

 

 

•  Insert the pivoting bearing with the clamping plates in the 

guiding rail. Ensure that the acute side of the post profile 
points forward. If required, slightly fix the pivot.

 

 

•  Insert the post profile with the pivoting bearing into the base 

plate.

 

 

• Re-install the cover of the guiding rail.

Содержание Vario-Pergola

Страница 1: ...VARIO PERGOLA INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS VARIO PERGOLA self supporting sunroof...

Страница 2: ...MATERIALS 4 2 2 PREPARING THE INSTALLATION 4 2 3 MOUNTING SITUATIONS WALL AND CEILING INSTALLATION 5 2 4 MOUNTING HEIGHT AND POSITION OF THE BRACKETS 6 2 5 MOUNTING TECHNIQUE 7 2 6 MOUNTING THE CASING...

Страница 3: ...ts important product information for the installation engineer or user 1 2 GENERAL SAFETY INFORMATION Only qualified and duly specialised companies or trained specialist personnel may be permitted to...

Страница 4: ...ing for alignment of the brackets Test cable resp adjustment set for initial operation Aluminium chop saw to shorten the posts 2 2 PREPARING THE INSTALLATION Secure the installation zone the secured z...

Страница 5: ...of PERGOLINE Ceiling installation of PERGOLINE with angle towards the back or towards the front Headroom approx 35 mm Headroom approx 75 mm approx 130 mm approx 130 mm approx 175 mm 100 mm 100 mm 200...

Страница 6: ...n the fall bar and ube or casing and at the rollers of the moving fall bar To protect human safety the mounting height ast 2 50m If the situation requires a mounting height less than the stated minimu...

Страница 7: ...true alignment Even out irregularities of the base by using suitable spacers Then tighten all screws and check that brackets are firmly attached 2 7 mounting the CaSing Pre adjusting the inclination L...

Страница 8: ...ht of the posts to the situation on site For this purpose shorten the post profile on the side opposite the pivot Demount the cover of the guiding rail Insert the pivoting bearing with the clamping pl...

Страница 9: ...he fall bar Adjust the inclination of the brackets the gap between the guide rail and the casing end cap must be uniform InstallatIon InstructIons Pergoline Attach the guide rails to the pegs of the c...

Страница 10: ...threaded plates have twisted correctly in the installation channel After tightening the longer diagonal must be crosswise to the clamping channel of the guide rail see drawing next to the text Lock th...

Страница 11: ...gs onto the peg of the post s base plate and tighten firmly Fix the post s base plate with the appropriate fixing materials on the base Connect a test cable to the system and extend approximately 20cm...

Страница 12: ...e pulling strap in the end cap ensuring that the pulling strap is not twisted Insert the sleeve with the chamfer of the bore pointing towards the screw head Firmly tighten the countersunk screw Now re...

Страница 13: ...ation ensure that nobody is in this area there is a risk of injury in case of a malfunction For trial operation always use the test cable no automatic control units etc In addition the operator must b...

Страница 14: ...any more Driving gear does not work End positions of the driving gear changed or incorrect end position setting Reset or re program end positions see Driving Gear Instruction Manual System does not cl...

Страница 15: ...fall the same 3 5 4 2 1 7 ANNEX 7 1 ALIGNMENT OF THE FALL BAR Measure the distance between the fall bar and the rail end on both sides The correction is made on the side that extends further Remove co...