Helioscreen Vario-Pergola Скачать руководство пользователя страница 15

VARIO-PERGOLA 

INSTALLATION INSTRUCTIONS

Helioscreen Australia Pty Ltd

Page 15

Art.-Nr.: 930059    © by 

WO&WO

   

Literal mistakes and technical changes excepted

   

Valid from February 2010

    

Page 14

InstallatIon InstructIons  

Pergoline

7. 

annex

For adjustments of the driving gear, please refer to the “Driving gear adjustment” sheet.

The XLINE

 shading system requires the adjustment of both driving gear end positions. A failure to set the driving 

gear end positions can lead to an impaired function of or damages to the system. (the use of a driving gear with 

electronic torque-activated cut-off mechanism is not permissible).

a.  

aDjuStment oF the Driving gear enD PoSition

b.  

alignment oF the Fall bar

Measure the distance between the fall bar and the rail end 

on both sides.

The correction is made on the side that extends further.

Remove countersunk screw (1) with SW 4mm Allen key and 

take off plastic cover (2). Get hold of the end of the strap (5) 

with your hand or a tool and do not let go.

Loosen counternut (3) with SW13mm ring spanner.

Loosen the threaded pin (4) with SW 4mm Allen key.

Now give pulling strap enough rope so that the fall bar 

moves to the correct position. 

Then slightly tighten threaded pin (4) and lock with nut (3).

Wind up protruding tape and stow away in the cover. Fit 

cover and fasten with countersunk screw.

If the fall bar is parallel, the fabric tension should be roughly 

the same on either side.

3

5

4

2

1

7. ANNEX

 

7.1. ALIGNMENT OF THE FALL BAR

 

 

 Measure the distance between the fall bar and the rail end 
on both sides.

 

 

 The correction is made on the side that extends further. 

Remove countersunk screw (1) with SW 4mm Allen key 
and take off plastic cover (2). Get hold of the end of the 
strap (5) with your hand or a tool and do not let go. Loosen 
counternut (3) with SW13mm ring spanner. Loosen the 
threaded pin (4) with SW 4mm Allen key. Now give pulling 

strap enough rope so that the fall bar moves to the correct 

position. Then slightly tighten threaded pin (4) and lock 
with nut (3).

 

 

 Wind up protruding tape and stow away in the cover. Fit 

cover and fasten with countersunk screw.

 

 

 If the fall bar is parallel, the fabric tension should be roughly 
the same on either side.

Содержание Vario-Pergola

Страница 1: ...VARIO PERGOLA INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS VARIO PERGOLA self supporting sunroof...

Страница 2: ...MATERIALS 4 2 2 PREPARING THE INSTALLATION 4 2 3 MOUNTING SITUATIONS WALL AND CEILING INSTALLATION 5 2 4 MOUNTING HEIGHT AND POSITION OF THE BRACKETS 6 2 5 MOUNTING TECHNIQUE 7 2 6 MOUNTING THE CASING...

Страница 3: ...ts important product information for the installation engineer or user 1 2 GENERAL SAFETY INFORMATION Only qualified and duly specialised companies or trained specialist personnel may be permitted to...

Страница 4: ...ing for alignment of the brackets Test cable resp adjustment set for initial operation Aluminium chop saw to shorten the posts 2 2 PREPARING THE INSTALLATION Secure the installation zone the secured z...

Страница 5: ...of PERGOLINE Ceiling installation of PERGOLINE with angle towards the back or towards the front Headroom approx 35 mm Headroom approx 75 mm approx 130 mm approx 130 mm approx 175 mm 100 mm 100 mm 200...

Страница 6: ...n the fall bar and ube or casing and at the rollers of the moving fall bar To protect human safety the mounting height ast 2 50m If the situation requires a mounting height less than the stated minimu...

Страница 7: ...true alignment Even out irregularities of the base by using suitable spacers Then tighten all screws and check that brackets are firmly attached 2 7 mounting the CaSing Pre adjusting the inclination L...

Страница 8: ...ht of the posts to the situation on site For this purpose shorten the post profile on the side opposite the pivot Demount the cover of the guiding rail Insert the pivoting bearing with the clamping pl...

Страница 9: ...he fall bar Adjust the inclination of the brackets the gap between the guide rail and the casing end cap must be uniform InstallatIon InstructIons Pergoline Attach the guide rails to the pegs of the c...

Страница 10: ...threaded plates have twisted correctly in the installation channel After tightening the longer diagonal must be crosswise to the clamping channel of the guide rail see drawing next to the text Lock th...

Страница 11: ...gs onto the peg of the post s base plate and tighten firmly Fix the post s base plate with the appropriate fixing materials on the base Connect a test cable to the system and extend approximately 20cm...

Страница 12: ...e pulling strap in the end cap ensuring that the pulling strap is not twisted Insert the sleeve with the chamfer of the bore pointing towards the screw head Firmly tighten the countersunk screw Now re...

Страница 13: ...ation ensure that nobody is in this area there is a risk of injury in case of a malfunction For trial operation always use the test cable no automatic control units etc In addition the operator must b...

Страница 14: ...any more Driving gear does not work End positions of the driving gear changed or incorrect end position setting Reset or re program end positions see Driving Gear Instruction Manual System does not cl...

Страница 15: ...fall the same 3 5 4 2 1 7 ANNEX 7 1 ALIGNMENT OF THE FALL BAR Measure the distance between the fall bar and the rail end on both sides The correction is made on the side that extends further Remove co...

Отзывы: