InstallatIon InstructIons  

Pergoline

2.9.     mounting the DiStanCe tube(S): 

2.10.    alignment oF the SyStem

• 

Align the system by moving the casing in the brackets or  

 

sideways movement of the two posts in the diagonal.

 

 

Deviations of the diagonal measurements by more than  

 

5 mm may result in malfunctions. 

• 

Vertically align the posts

 

  To stabilise the parallelism of the system, mount at least  

 

  one distance tube before aligning the system at the post. 

• 

  Insert the washer and turn the distance tube holder into  

 

  the end cap of the distance tube until it is fully in. 

• 

  Align the tightening surfaces of both holders.

• 

  Secure the holders in the guide rails with screws and  

 

  hammerhead threaded plates. 

 

  The writing on the hammerhead threaded plates must  

 

  point towards the surface of the holder.

 • 

The position depends on the extended length of the  

 

system. Up to an extended length of 3500mm near the  

 

posts, from 3501mm extended length distributed evenly  

 

over the length of the guide rails.

 

The position of the distance tubes can also be adjusted  

 

to the cross seams of the fabric.

• 

  Distribute additional distance tubes over the length 

 

 

  of the guide rails.

  

  To fasten the distance tube holders, push the screws with  

 

  the hammerhead threaded plates up and twist (as described  

 

  in 2.8.). Ensure that the hammerhead threaded plates have  

 

  twisted correctly in the installation channel.

• 

After tightening, the longer diagonal must be crosswise 

 

 

to the clamping channel of the guide rail (see drawing  

 

next to the text).

 

• 

Lock the nuts against the end caps of the distance tube.









parallelism rear

parallelism front

diagonal

dia

go

na

l

 

2.9. ALIGNMENT OF THE SYSTEM

 

 

•  Align the system by moving the casing in the 

brackets or sideways movement of the two posts in 
the diagonal.

 

i

 

•  Deviations of the diagonal measurements by more 

than 5 mm may result in malfunctions.

 

 

• Vertically align the posts

 

 

• Fix the post profile on the post’s base plate.

 

 

•  For this purpose, turn the threaded pins in the groove 

nuts through the drillings onto the peg of the post’s 
base plate and tighten firmly.

 

 

•  Fix the post’s base plate with the appropriate fixing 

materials on the base.

 

 

•  Connect a test cable to the system and extend 

approximately 20cm.

 

 

•  Connect the guide rails with the pegs of the casing 

using the countersunk screws.

Valid from February 2010

   

Literal mistakes and technical changes excepted     © bei 

WO&WO

    

Art.-Nr.: 930059

Page 11

InstallatIon InstructIons  

Pergoline



• 

Fix the post profile on the post’s base plate. 

 

• 

For this purpose, turn the threaded pins in the groove nuts    

 

through the drillings onto the peg of the post’s base plate  

 

and tighten firmly.  

• 

Fix the post’s base plate with the appropriate fixing 

 

 

materials on the base.

• 

Connect a test cable to the system and 

 

 

extend approximately 20cm.

• 

Connect the guide rails with the pegs of the 

 

 

casing using the countersunk screws.

3.     line SyStemS

 

To install line systems, at first mount all boxes and  

 

only then proceed with the guide rails and posts as  

 

described for the individual systems.

 

Before inserting the end cap of the centre guide rail as  

 

described in 2.8, it is necessary to fit the second pulling  

 

strap with the pulley.

• 

For the installation, pull the fall bar of both systems on  

 

the side of the centre guide rail approximately 100mm  

 

in extended direction with the pulling strap, and then  

 

insert a screwdriver between the fall bar and the casing  

 

to prevent the fall bar from retracting.

 

• 

At the end cap of the centre guide rail, loosen 

 

 

countersunk screw (1) with an SW 6 Allen key and   

 

remove including the interior sleeve (2). Take out the  

 

deflection pulley (3) and place pulling strap over it.

• 

Place the pulley with the pulling strap in the end cap  

 

(ensuring that the pulling strap is not twisted!). Insert the  

 

sleeve with the chamfer of the bore pointing towards the  

 

screw head. Firmly tighten the countersunk screw.

• 

Now remove the strap securing clips (4) and proceed  

 

according to 2.8.

Chamfer

Содержание Vario-Pergola

Страница 1: ...VARIO PERGOLA INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS VARIO PERGOLA self supporting sunroof...

Страница 2: ...MATERIALS 4 2 2 PREPARING THE INSTALLATION 4 2 3 MOUNTING SITUATIONS WALL AND CEILING INSTALLATION 5 2 4 MOUNTING HEIGHT AND POSITION OF THE BRACKETS 6 2 5 MOUNTING TECHNIQUE 7 2 6 MOUNTING THE CASING...

Страница 3: ...ts important product information for the installation engineer or user 1 2 GENERAL SAFETY INFORMATION Only qualified and duly specialised companies or trained specialist personnel may be permitted to...

Страница 4: ...ing for alignment of the brackets Test cable resp adjustment set for initial operation Aluminium chop saw to shorten the posts 2 2 PREPARING THE INSTALLATION Secure the installation zone the secured z...

Страница 5: ...of PERGOLINE Ceiling installation of PERGOLINE with angle towards the back or towards the front Headroom approx 35 mm Headroom approx 75 mm approx 130 mm approx 130 mm approx 175 mm 100 mm 100 mm 200...

Страница 6: ...n the fall bar and ube or casing and at the rollers of the moving fall bar To protect human safety the mounting height ast 2 50m If the situation requires a mounting height less than the stated minimu...

Страница 7: ...true alignment Even out irregularities of the base by using suitable spacers Then tighten all screws and check that brackets are firmly attached 2 7 mounting the CaSing Pre adjusting the inclination L...

Страница 8: ...ht of the posts to the situation on site For this purpose shorten the post profile on the side opposite the pivot Demount the cover of the guiding rail Insert the pivoting bearing with the clamping pl...

Страница 9: ...he fall bar Adjust the inclination of the brackets the gap between the guide rail and the casing end cap must be uniform InstallatIon InstructIons Pergoline Attach the guide rails to the pegs of the c...

Страница 10: ...threaded plates have twisted correctly in the installation channel After tightening the longer diagonal must be crosswise to the clamping channel of the guide rail see drawing next to the text Lock th...

Страница 11: ...gs onto the peg of the post s base plate and tighten firmly Fix the post s base plate with the appropriate fixing materials on the base Connect a test cable to the system and extend approximately 20cm...

Страница 12: ...e pulling strap in the end cap ensuring that the pulling strap is not twisted Insert the sleeve with the chamfer of the bore pointing towards the screw head Firmly tighten the countersunk screw Now re...

Страница 13: ...ation ensure that nobody is in this area there is a risk of injury in case of a malfunction For trial operation always use the test cable no automatic control units etc In addition the operator must b...

Страница 14: ...any more Driving gear does not work End positions of the driving gear changed or incorrect end position setting Reset or re program end positions see Driving Gear Instruction Manual System does not cl...

Страница 15: ...fall the same 3 5 4 2 1 7 ANNEX 7 1 ALIGNMENT OF THE FALL BAR Measure the distance between the fall bar and the rail end on both sides The correction is made on the side that extends further Remove co...