8
2.5
Foot control
1.
Mount the foot control through the socket (1), and tighten with your
fingers.
2.6
Operating lamp
1.
Mount the adaptor tube with the plastic bracket in the hole (2) and
gently push the tube down, until it is mounted tightly.
2.
Lead the lamp cable through the adapter tube and feather until
it reaches the power distribution board.
3.
Place the lamp on the adapter tube.
4.
Connect the cable to the power distribution board terminal, labelled:
Lamps.
If the unit is provided with a turn on/turn off function, please connect the lamp
cable to the circuit, labelled: ON/OFF.
2.7
X-ray machine
1.
Mount the adapter tube with the plastic bracket into the hole (3) and
gently push it into place. Ensure it is mounted firmly.
2.
Thread the X-ray machine cable through the adaptor tube.
3.
Place the X-ray machine on the adapter tube.
3.
Connect the X-ray machine according the prescribed procedure from
the supplier.
2.8
Call system
1.
Mount the cable from the call system to the power distribution board
terminal, labelled: Bell.
Содержание UnicLine 5D
Страница 7: ...7...
Страница 13: ...13 3 Final Test To be completed by authorized technician...
Страница 15: ...15 To be completed by authorized technician and the Dentist...
Страница 16: ...16 5 Installation plan and floor design 500 min 440 min 440 min 540 465 735 500...
Страница 18: ...18 5 1 Drilling diagram Please use the enclosed diagram when placing the unit in the clinic...
Страница 19: ...Baldersh j 38 DK 2635 Ish j Denmark Tel 45 4332 0990 Fax 45 4332 0980 www heka dental dk...