Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
Label the system when charging is complete (if not already).
Extreme care shall be taken not to overfill the refrigeration system. Prior to recharging the
system it shall be pressure tested with OFN. The system shall be leak tested on completion
of charging but prior to commissioning. A follow up leak test shall be carried out prior to
leaving the site.
r. Decommisioning
Before carrying out this procedure, it is essential that the technician is completely familiar
with the equipment and all its detail. It is recommended good practice that all refrigerants
are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall
be taken in case analysis is required prior to re-use of reclaimed refrigerant. It is essential
that electrical power is available before the task is commenced.
-
Become familiar with the equipment and its operation.
-
Isolate system electrically.
-
Before attempting the procedure ensure that: Mechanical handling equipment is
available, if required, for handling refrigerant cylinders;All personal protective
equipment is available and being used correctly; The recovery process is supervised
at all times by a competent person; Recovery equipment and cylinders conform to
the appropriate standards.
-
Pump down refrigerant system, if possible.
-
If a vacuum is not possible, make a manifold so that refrigerant can be removed
from various parts of the system.
-
Make sure that cylinder is situated on the scales before recovery takes place.
-
Start the recovery machine and operate in accordance with manufacturer's
instructions.
-
Do not overfill cylinders. (No more than 80 % volume liquid charge).
-
Do not exceed the maximum working pressure of thecylinder, even temporarily.
-
When the cylinders have been filled correctly and the process completed, make
sure that the cylinders and the equipment are removed from site promptly and all
isolation valves on the equipment are closed off.
-
Recovered refrigerant shall not be charged into another refrigeration system unless
it has been cleaned and checked.
s. Labelling
Equipment shall be labelled stating that it has been de-commissioned and emptied of
refrigerant. The label shall be dated and signed. Ensure that there are labels on the
equipment stating the equipment contains flammable refrigerant.
Содержание HDU-M20
Страница 52: ...www heinner com 51 HDU M20 www heinner com 20 L...
Страница 53: ...www heinner com 52 I II...
Страница 54: ...www heinner com 53 III 1 2 3 4 5 6 7 8 9 10 11 12...
Страница 55: ...www heinner com 54 1 2 3 4 5 6 7 8 9 10 11 12 T3 15A 250V 350V...
Страница 56: ...www heinner com 55 IV R32 R290 4...
Страница 57: ...www heinner com 56 R32 R290 1 2 3 4 5 6 a...
Страница 58: ...www heinner com 57...
Страница 59: ...www heinner com 58 1 2...
Страница 60: ...www heinner com 59 25 o...
Страница 61: ...www heinner com 60 80...
Страница 62: ...www heinner com 61 t...
Страница 63: ...www heinner com 62 V...
Страница 64: ...www heinner com 63...
Страница 65: ...www heinner com 64 VI 20 5 C 41 F 5 C 41 F 40 20 20 20 40...
Страница 66: ...www heinner com 65 24 5 C 35 C...
Страница 67: ...www heinner com 66 5 CONT 0 5 10 1 24 5 0 0 P2 35 85 5 0 24...
Страница 68: ...www heinner com 67 40 50 60 TURBO 30 3 3...
Страница 69: ...www heinner com 68 VII 1 8 P2 30 8 P2 2...
Страница 70: ...www heinner com 69 1 2 3...
Страница 71: ...www heinner com 70...
Страница 72: ...www heinner com 71 1 2 3 30 A B A B VIII A B...
Страница 73: ...www heinner com 72 A B C C A B B C...
Страница 74: ...www heinner com 73 A B A B...
Страница 75: ...www heinner com 74 5 C 41 F ES AS P1 P2 IX...