background image

Technical DocumenTaTion

Steam distribution system

1115766  

en

  

080

6

optiSorp

Содержание Defensor OptiSorp

Страница 1: ...Technical Documentation Steam distribution system 1115766 EN 0806 OptiSorp...

Страница 2: ......

Страница 3: ...1 6 Maintenance 5 2 Notes for the planning engineer 6 2 1 Layout 6 2 2 Dimension diagrams 6 2 3 Power selection diagram OptiSorp Systems 1 4 7 2 4 Type key 7 2 5 Determination of the humidification d...

Страница 4: ...made from stain less steel and high grade plastic components It is designed for con nection to the Walter Meier steam humidi fiers The OptiSorp steam distribu tion system is installed directly in the...

Страница 5: ...d then be installed according to the instructions in the techni cal tem It is advisable to drain the con densate separately and not return it to the humidifier owing to the in creased volume 1 5 Putti...

Страница 6: ...can be made with the software programme or from the layout tables The system is determined by the number of steam connections of the steam humidifier This also determines the maximum steam output The...

Страница 7: ...h 30 45 D2 mm 350 500 650 800 1000 1200 1500 H min mm 450 600 800 950 1150 1350 1650 System 2 mD max kg h 60 90 D2 mm 350 500 650 800 1000 1200 1500 1800 2000 H min mm 450 600 800 950 1150 1350 1650 1...

Страница 8: ...r faxing Layout data required Installation 1 Installation 2 Installation 3 Installation 4 1 Clear height of air duct B without insulation mm 2 Clear width of air duct H without insulation mm 3 Wall th...

Страница 9: ...r vertical ducts When mounting in a vertical duct the nozzle pipes must have a minimum declination of 20 and the end pieces of the collector pipes must be turned so that the vertical condensate connec...

Страница 10: ...screws Pay attention that the condensate drains are below the steam hose connection 5 Starting with the lowest collector pipe fix the steam hose connections with the 4 screws at the duct wall 6 Align...

Страница 11: ...e four screws Pay attention that the condensate drains are below the steam hose connection 5 Starting with the lowest collector pipe fix the steam hose connections with the 4 screws at the duct wall 6...

Страница 12: ...Range duct height mm Art No Foothold Pos 1 No x Length mm Rail Pos 2 mm Bracket Pos 3 450 950 1117477 1 x 450 mm 500 4 950 1350 1117478 2 x 450 mm 500 4 1350 2300 1117479 2 x 450 mm 1400 4 2300 3200...

Страница 13: ...13 Notes...

Страница 14: ...Notes...

Страница 15: ...Walter Meier Climate International Ltd 2007 Printed in Switzerland Technical modifications reserved...

Страница 16: ...er Climate International Ltd Talstr 35 37 P O Box CH 8808 Pf ffikon Switzerland Phone 41 55 416 61 11 Fax 41 55 416 62 62 www waltermeier com international climate waltermeier com Solutions for Indoor...

Отзывы: