10.1 Prior to installing the boiler check the contents of
the carton: Appliance, Valves (Fixing Jig Optional), Wall
Hanging Bracket, Mounting Template Service,
Installation and User Manual, Guarantee Card and
Benchmark Log Book. The boiler dimensions are given
in Figure 10.
10.2 Ensure that the boiler is suitable for the gas
supply by checking the data plate, which is situated on
the inside of the control panel door, and that the
system and chosen boiler position is in accordance to
Sections 5, 6 and 7 of these instructions.
10.3 Position the supplied template on the wall,
ensuring it is level both vertically and horizontally
(figure 11). Mark the boiler fixing jig (if required), wall
bracket fixing positions and flue outlet position (rear
flue only). For flue side exit from the boiler - Mark the
horizontal flue centre line on the rear wall. Extend the
horizontal line to the side wall allowing a 3
0
decline
back towards the boiler, to enable condensate to drain
back through the boiler. Mark the flue centre vertical
line. (
figure 12)
Figure 10.
Figure 11.
Dimension
A
405
430
169
60/100
B
169
C 60/100
10.4 When cutting the flue hole it is recommended that a
105mm diameter core drill is used where both internal
and external access for the flue installation is available.
Where only internal access is available a 125mm
diameter core drill should be used. (Note: Please take
adequate precautions to prevent debris entering the
boiler via the flue outlet).
10.5 Using a 8·5mm drill bit, drill the holes for fixing jig
(optional) and hanging bracket. Locate and secure the
supplied wall mounting bracket in position (
figure 13 ).
10.6 Mount the boiler onto the fixing bracket via the
boiler mounting slots, (
figure 13 ).
10.7 Connect isolation valves assembled to the boiler
ensuring the washers are fitted correctly.
10.8 On installing the flue, determine the required
length of the outer air duct by measuring the distance 'L'
(
figure 15 ) from the face of the external wall to the back
of boiler's elbow connecting collar. The measurement
for the inner flue duct will be 'L' + 20mm
10. Boiler Installation
Figure 12
30
130
130
CONDENSATE
CONNECTION
SDV
outlet
86
86
50
98
151
151
027
BOILER
DOMESTIC WATER
CENTRAL HEATING
Page 15
B
033
A
C
=
=
A
Bracket Fixing Slots
Boiler Mounting Tabs
(CONDENSING)
(NON-CONDENSING)
Figure 13
Distance to centre line 169 mm
Capriz 25
Capriz 28
15
Содержание capriz 25
Страница 36: ...www heatline co uk 25 28 Condensing Wall Mounted Combination Boiler User Instructions 34...
Страница 40: ...Page 38 3005114697 38...
Страница 41: ...3003202303 01 Page 39 39...