
24
WARNING
ENSURE THAT THE FIBERGLASS
ROPE GASKET SUPPLIED WITH THE
FIREPLACE SEALS BETWEEN THE
FIRST VENT COMPONENT AND THE
OUTER FIREPLACE WRAP.
If the installation is for a termination cap attached
directly to the fireplace, skip to the sections,
Install
Firestops
and
Vent Termination
.
2. Continue Adding Vent Components
To continue adding vent components in accordance
with the pre-planned vent system configuration:
Ensure that each succeeding vent component is
securely fitted and locked into the preceding
component in the vent system.
90° elbows may be installed and rotated to any point
around the preceding components vertical axis. If
an elbow does not end up in a locked position with
the preceding component, attach with a minimum of
two (2) sheet metal screws.
Continue adding vent
components, locking
each succeeding
component into place.
Figure 20. Adding Venting Components
3. Install Support Brackets
For Horizontal Runs -
The vent system must be
supported every five (5) feet of horizontal run by a
horizontal pipe support.
To install support brackets for horizontal runs:
Place the pipe supports around the vent pipe.
Nail the pipe supports to the framing members.
Содержание SL-32
Страница 8: ...5 Figure 1 Diagram of the SL 36 Circulating Version ...
Страница 9: ...6 Figure 2 Diagram of the SL 36 Clean face Version ...
Страница 10: ...7 Figure 3 Diagram of the SL 36GDV ...
Страница 11: ...8 Figure 4 Diagram of the SL 32S and SL 32 ...
Страница 12: ...9 Figure 5 Diagram of the SL 32GDV ...
Страница 19: ...16 STRAIGHTOUTHORIZONTAL VENTING H Max Run 36 914 mm Figure 12 Straight Out Horizontal Venting ...