
29
Continue installing rows of
shingles by staggering at front.
4
SHINGLES
continued...
Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front,
stagger each row.
3
1"
(2,5 cm)
1"
(2,5 cm)
BACK OF
SHED
FRONT OF
SHED
FRONT OF
SHED
Flush with rain slots.
Flush with rain slots.
Notch
Notch
You have nished shingling your roof. Proceed to capping the ridge.
FINISH
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as
shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
5
7
6
9
8
• If more than 5" to rain slot you must install another row of shingles.
5"
(12,7 cm) MAX.
Top of rain slot.
Cut Off.
CUT
Содержание PASADENA PAVILION 10x12
Страница 2: ... This page intentionally left blank ...