25
2" (5,1 cm)
x32
ONCE MOUNTING HARDWARE IS INSTALLED, FOLLOW THE STEPS BELOW TO INSTALL
POST SKIRT
s.
1
2
3
4
5
Post
Skirts x8
Counter-sink all nail heads.
When using post mounting hardware, there will be interference from protruding screws or nail
heads. Using a scrap piece of scrap wood (not included) and a Hammer, gently tap the wood
and Post Skirt against the mounting hardware to leave reference marks on the back side of the
Post Skirt
(Fig. 1,2)
.
Use a hand tool to remove wood at marks
(Fig. 5)
.
Secure using four 2" (5,1 cm) nish nails for each post skirt.
POST SKIRTS
PARTS REQUIRED:
x8
1
BEGIN
2
FINISH
3
7/8 x 3-3/8 x 11-7/8" (2,2 x 8,6 x 30,2 cm)
Содержание PASADENA PAVILION 10x12
Страница 2: ... This page intentionally left blank ...