5 Commissioning the system – Procedure
42
F
UEL
•
Is there a sufficient quantity of fuel?
5.2 Procedure
✎
See also operating manual “HDG Control”, Chapter “4
Commissioning the system”.
S
ETTING
THE
FUEL
QUANTITY
1.
Start the conveyor auger in manual mode.
2.
Collect the pellets with a suitable container.
3.
Repeat the cycle two (with HDG K21/26/33) or three times (with
HDG K10/15).
4.
Weigh the amount of pellets collected in the second or third cycle.
5.
Multiply the weight by a factor of 10 (= fuel quantity in kg/h).
6.
Enter the calculated value in the boiler control system.
✎
See operating manual “HDG Control”, chapter “7 HDG K10 - 60
parameters”.
✓
The fuel quantity has been calculated.
P
ERFORM
ACTUATOR
TEST
In addition to the automatic self-test, individual actuators can also be
manually activated as required.
✎
See operating manual “HDG Control”, chapter “7 HDG K10 - 60
parameters”.
A
DAPTING
PARAMETERS
If the heating system does not work correctly, the parameters must
be adjusted accordingly.
✎
See operating manual “HDG Control”, chapter “7 HDG K10 - 60
parameters”.
Important!
Commission the HDG K10 - 33 heating system in accordance with
the specifications from the supplied commissioning protocol.
One cycle of the conveyor auger lasts 6 mins.