![HDG K10 Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/hdg/k10/k10_operating-manual_2112440039.webp)
4 Planning and installation – Connecting the chimney
39
C
ONNECTING
THE
SUCTION
AND
RETURN
HOSES
1.
Lay bare about 10 cm of the end of the braid (1) embedded in the
return hose.
2.
Bend the braid (1) inwards into the hose.
3.
Undo the four screws and remove the cover (4) of the reservoir.
4.
Fit the suction hose (2) with a hose clip on the left connecting port
of the reservoir.
5.
Fit the return hose (3) with a hose clip on the right connecting port
of the reservoir.
✓
The suction and return hose is connected.
4.5 Connecting the chimney
1.
Connect the flue gas pipe to the chimney connection.
2.
Make sure that the connecting piece does not protrude into the
chimney.
3.
Seal the connection to the chimney with highly fireproof silicone
or with a suitable mortar.
✓
The boiler is now connected to the chimney.
4.6 Electrical system
The electrical connections should be made in accordance with VDE
guideline 0100, “Electrical systems in buildings”.
✎
The technical details are described in chapter “3 Mode of
operation”, section “3.3 Technical data”.
✎
The circuit diagrams for the HDG K10 - 33 can be found in
“Electrical plans for the HDG K10 - 60”. The connections for the
mains supply line can also be found in this document.
Figure 4/40 - Removing the packaging
1
4
3
2
In the event that the connections do not move easily when
attached, only moisten with water (do not use grease).
Содержание K10
Страница 1: ...hdg bavaria com HDG K10 15 21 26 33 Operating manual ...
Страница 2: ......
Страница 63: ......