230 VAC Supply to Master Control Panel
ONLY move the E9 connection
E9
When supplying 230 VAC instead of 115 VAC to the Master control panel, the following
jumper cable switch must be moved.
1. Move the jumper wire connection E9 to E7 230 VAC connection on the RELAY
BOARD just above the transformer.
2. Hard wire the power cord to a dedicated 10-15 amp breaker. The master
control panel draws roughly 3 amps.
Page 4
Jumper configured for 240 VAC
Содержание KingShark 2 Plus
Страница 1: ...Commercial Cleaner Troubleshooting Guide 2012 Hayward Industries Inc...
Страница 36: ...Ohm Check at Motor Step 28 Ohm meter 0 9 ohms 1 3 ohms for 115 VAC 4 3 ohms 6 3 ohms for 240 VAC Page 34...
Страница 43: ...Handle Removal Step 1 Use a flat head screwdriver on both ends of the handle pin to unscrew and remove Page 41...