Voltage Check to Swivel
To verify voltage is passing through the power supply cord to the swivel :
1. Power the system off
2. Disconnect the
power end connection
at the
swive
l
3.
Power the system ON and make sure the
RUN
light is illuminated.
4. Put meter leads on the black and white ports. 115 VAC should be present. If not, verify
breaker is good, ON switch is ON, and all power is correct.
POWER END CONNECTION
WH
BLACK
power cord
Step 26:
Page 32
.
Содержание KingShark 2 Plus
Страница 1: ...Commercial Cleaner Troubleshooting Guide 2012 Hayward Industries Inc...
Страница 36: ...Ohm Check at Motor Step 28 Ohm meter 0 9 ohms 1 3 ohms for 115 VAC 4 3 ohms 6 3 ohms for 240 VAC Page 34...
Страница 43: ...Handle Removal Step 1 Use a flat head screwdriver on both ends of the handle pin to unscrew and remove Page 41...