BARRIER
(fastening)
:
Four M12 fixing bolts can be inserted into the foundation during pouring or alternatively you can drill holes in the
foundation and use expansion plugs (supplied).
Hole spacing: 150mm x 260mm. To do this, place the barrier on the foundation and mark the holes. Then move the
barrier and drill the holes. Put expansion plugs into the drilled holes or instert the screws into the still wet concrete.
Place barrier over the bolts and tighten using the washers and nuts provided.
BARRIER ARM:
Fit the barrier arm to the barrier and fasten it with four M10x16 screws.
Содержание 535Y
Страница 1: ...HATO 535Y AUTOMATIC BARRIER OPERATING MANUAL...
Страница 6: ......
Страница 23: ...NOTES...
Страница 26: ......
Страница 27: ...HATO TRADE SP ZOO ul eromskiego 1 41 205 Sosnowiec POLAND tel 032 785 25 42 www hato com pl DISTRIBUTOR SELLER...