The LEFT barrier is shown in the diagram above.
ASSEMBLY AND ADJUSTMENT
REQUIRED TOOLS:
- set of keys
- set of screwdrivers
- drill
CORDS:
- power cord 1,5mm
2
- signal cord 0,5mm
2
FOUNDATION
:
When the foundation is poured under the barrier, a PVC pipe should be placed in it (min. 12mm
diameter). This way we can secure the cords brought to the barrier in front of the mechanical
device. Diagram above. Power and signal cord should always be separated.
Содержание 535Y
Страница 1: ...HATO 535Y AUTOMATIC BARRIER OPERATING MANUAL...
Страница 6: ......
Страница 23: ...NOTES...
Страница 26: ......
Страница 27: ...HATO TRADE SP ZOO ul eromskiego 1 41 205 Sosnowiec POLAND tel 032 785 25 42 www hato com pl DISTRIBUTOR SELLER...