5 |
P a g e
Before You Start
1.
Review all relevant documentation.
a.
Site photos
b.
Field drawings
c.
Assessment form
d.
Harmar configuration drawing
e.
Harmar components list
2.
Verify all site work has been completed in advance.
3.
Consider if paver stones or a landing pad will be needed.
4.
Verify all parts/components are loaded.
5.
Verify all tools are loaded.
6.
Verify all post-installation documents are ready.
7.
Consider the “what ifs”… Bring extras when in doubt.
04OCT19 | 630-00103-01 Rev B