HIGHLANDER II VERTICAL PLATFORM LIFTS:
Install Manual
17FEB2021 | 630-00113 REV C
14
INSTALLATION
HIGHLANDER II: SECTION 4
PLATFORM CONNECTION
1. Place the platform on a support object strong
enough to handle the weight of the platform.
Position the platform on the support located
near the bottom of the VPL.
2. Press the service button on the control
electronics board. All four (4) status indicator
LED's will flash green, to show that "Service
Mode" is active. The unit will remain in
"Service Mode" for ten (10) minutes. Press the
service button again if needed.
3. Use the platform control box to move the
carriage up or down to align the platform and
carriage mounting holes.
4. Install the four (4) 1/2
"
bolts using the low
profile nyloc nuts on the lower bolts and a
standard nyloc nut on the upper bolts.
5. Secure the safety pan harness and platform
control harness under the clip at the top of
the carriage flange.
INSTALLING THE PLATFORM
CONTROL GUARD PANEL
1. Remove the two (2) 1/4
"
- 20 x 2
"
bolts from
each corner of the platform.
2. Insert the control side guard panel posts into
the pockets on the platform with the smooth
side facing the inside of the platform. Fasten
in place with four (4) 1/4
"
- 20 x 2
"
bolts. Torque
bolts down sufficiently to hold guard panels
rigidly in-place. The platform material in front
of the pockets may deform slightly while
tightening bolts.
3. Remove the four (4) screws and nuts loosely
attached to the control box.
4. Fasten the control box to the control guard
panel securely with the four (4) screws and
nuts. Connect the ground ring terminal to the
bottom screw connecting the control box to
the panel.
INSTALLING A PLATFORM
GATE (IF EQUIPPED)
1. Align platform gate assembly on platform end
with floor and platform panels.
2. Install four (4) 1/4
"
-20 x 5/8
"
screws through
tabs in gate frame into threaded holes on
platform panels. See Figure 4-6.
Screws
Figure 4-6
3. Install three (3) 1/4
"
- 20 x 1
"
thread forming
screws through the bottom tube of the gate
frame. Screws are accessed through 7/8
"
diameter holes in front of the tube. Use a 3/8
"
nut driver or socket and extension to tighten
screws. DO NOT USE AN IMPACT TOOL TO
TIGHTEN SCREWS.
4. Route platform gate wire harness from the
gate over to safety pan 2-pin (safety pan) and
4-pin (platform gate harness) connector.
Содержание HIGHLANDER II
Страница 1: ...17FEB2021 630 00113 REV C HIGHLANDER II VERTICAL PLATFORM LIFT INSTALLATION SERVICE MANUAL...
Страница 2: ......
Страница 41: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 41 NOTES HIGHLANDER II...
Страница 42: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 42 NOTES HIGHLANDER II...
Страница 43: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 43 NOTES HIGHLANDER II...
Страница 44: ...2075 47th Street Sarasota FL 34234 800 833 0478 harmar com...