HIGHLANDER II VERTICAL PLATFORM LIFTS:
Install Manual
17FEB2021 | 630-00113 REV C
3
TABLE OF CONTENTS
HIGHLANDER II
TABLE OF CONTENTS
SAFETY ............................................................................................ 4
Safety Definition ................................................. 4
Environmental Cautions ...................................... 4
INTRODUCTION ............................................................................ 5
Device Name: Harmar Highlander II VPL .............. 5
Read and Understand .......................................... 5
Technical Specifications ...................................... 5
Code Statement .................................................. 5
Applicable Standards Based
on Installation Type ............................................. 5
Requirements under ASME A18.1 ........................ 6
ASME A18.1 Section 2: Vertical Platform Lifts ..... 6
ASME A18.1 Section 5:
Private Residence Vertical Platform Lifts ............. 6
Statement of Use ................................................ 6
Key Vertical Platform Lift Elements ..................... 7
Key Internal Vertical Platform Lift Elements ........ 8
PREPARATION ............................................................................... 9
Required Tools and Hardware ............................. 9
Recommended Tools ........................................... 9
Box Content ...................................................... 10
Required Components Not Supplied .................. 10
Unloading .......................................................... 10
Unpacking ......................................................... 10
Concrete ........................................................... 11
Material Handling .............................................. 11
Hoist Way (Shaft) .............................................. 11
Site Preparation ................................................ 11
INSTALLATION ............................................................................ 12
No Hoistway / No Floor Penetration .................. 12
Electrical Connection ........................................ 12
Battery Backup .................................................. 13
Platform Connection ......................................... 14
Installing the Platform Control Guard Panel ...... 14
Installing a Platform Gate (If Equipped) ............. 14
Installing the Platform Front Guard Panel ......... 15
Installing the Auto-Folding Ramp ...................... 15
Installing the Top Landing Gate ......................... 16
Fascia Panel Installation .................................... 17
Setting the Upper Limit Switch .......................... 18
Call Stations ...................................................... 18
Doors / Gates by Others .................................... 19
Final Positioning and Anchoring ........................ 19
Installing Fixed Ramps ....................................... 20
Installation Tower Check ................................... 20
Final Installation ................................................ 21
Operational Check ............................................. 21
Permanent Power Installation ........................... 22
Operator Familiarization ................................... 23
INSTALLATION QUICK START ............................................... 24
TROUBLESHOOTING ................................................................ 25
Status Codes ..................................................... 25
Control Electronics ............................................ 28
Control Electronics Tray .................................... 28
Control Board .................................................... 29
Gearmotor ........................................................ 34
Contactor Tray .................................................. 35
Up and Down Contactors .................................. 35
E-Brake Resistor ................................................ 35
Load Resistors ................................................... 35
Cooling Fan ....................................................... 35
Battery Backup .................................................. 35
Float Switch ....................................................... 36
Emergency Evacuation Procedure ..................... 37
Emergency Lowering Procedure ........................ 37
MAINTENANCE & INSPECTION ............................................ 39
Residential Applications .................................... 39
Commercial Applications ................................... 39
Maintenance Schedule ...................................... 40
Содержание HIGHLANDER II
Страница 1: ...17FEB2021 630 00113 REV C HIGHLANDER II VERTICAL PLATFORM LIFT INSTALLATION SERVICE MANUAL...
Страница 2: ......
Страница 41: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 41 NOTES HIGHLANDER II...
Страница 42: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 42 NOTES HIGHLANDER II...
Страница 43: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 43 NOTES HIGHLANDER II...
Страница 44: ...2075 47th Street Sarasota FL 34234 800 833 0478 harmar com...