HIGHLANDER II VERTICAL PLATFORM LIFTS:
Install Manual
17FEB2021 | 630-00113 REV C
8
INTRODUCTION
HIGHLANDER II: SECTION 2
KEY INTERNAL VERTICAL
PLATFORM LIFT ELEMENTS
1. Manual Lowering Tool
2. Motor / Gearbox
3. ACME Screw
4. Batteries
(if supplied)
5. Battery Charger and assembly (tray)
(if supplied) (not shown)
6. Inverter (if supplied)
7. Control Electronics Assembly
8. Upper / Lower /
Lower
Final Limit Switches
9. Tower Frame
10. Tower Legs
11. Wire Channel
12. Over-Speed Safety Assembly
13. Motor Contactors
14. Carriage
15. Trailing Cable
16. Cable Tensioning Pulley
17. Junction Box
(Main Power Supply Hookup)
1
13
2
7
9
8
15
11
6
4
17
3
14
10
12
16
Содержание HIGHLANDER II
Страница 1: ...17FEB2021 630 00113 REV C HIGHLANDER II VERTICAL PLATFORM LIFT INSTALLATION SERVICE MANUAL...
Страница 2: ......
Страница 41: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 41 NOTES HIGHLANDER II...
Страница 42: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 42 NOTES HIGHLANDER II...
Страница 43: ...HIGHLANDER II VERTICAL PLATFORM LIFTS Install Manual 17FEB2021 630 00113 REV C 43 NOTES HIGHLANDER II...
Страница 44: ...2075 47th Street Sarasota FL 34234 800 833 0478 harmar com...