
MAINTENANCE-INSPECTION REGISTER
COMPANY CARRYING OUT THE MAINTENANCE OPERATIONS
NOTES
PERSON IN CHARGE (First name and Last name)
DESCRIPTION OF THE INTERVENTION
OUTCOME
Date
Scheduled date for the next periodic inspection:
Positive
Periodic inspection
Negative
Repair
Signature
COMPANY CARRYING OUT THE MAINTENANCE OPERATIONS
NOTES
PERSON IN CHARGE (First name and Last name)
DESCRIPTION OF THE INTERVENTION
OUTCOME
Date
Scheduled date for the next periodic inspection:
Positive
Periodic inspection
Negative
Repair
Signature
COMPANY CARRYING OUT THE MAINTENANCE OPERATIONS
NOTES
PERSON IN CHARGE (First name and Last name)
DESCRIPTION OF THE INTERVENTION
OUTCOME
Date
Scheduled date for the next periodic inspection:
Positive
Periodic inspection
Negative
Repair
Signature
26/05/20 ENGLISH
42
Содержание R27LS
Страница 2: ......
Страница 53: ...26 01 22 ENGLISH 53 INBRKT X5 INBRKT X6...
Страница 57: ...26 01 22 ENGLISH 57 INMID ENTRY1 LS 60 60 160 400 116 5 116 5 0 5 0 5 43 2 INMID ENTRY1 LS...
Страница 58: ...58 ENGLISH 26 01 22 INMID ENTRY3 LS 400 116 5 116 5 58 86 28 31 INMID ENTRY3 LS...
Страница 66: ...66 ENGLISH 26 01 22 326 326 412 412 49 INTURN1 LS...
Страница 67: ...26 01 22 ENGLISH 67 326 652 412 49 INTURN2 LS...
Страница 73: ...26 01 22 ENGLISH 73 250mm INLINK LS INLINK LS INSTOP LS INSTOP LS 10 1 cm L6...
Страница 74: ...74 ENGLISH 26 01 22 250mm INLINK LS INLINK LS INSTOP LS INSTOP LS 10 1 cm L7...
Страница 85: ...26 01 22 ENGLISH 85 INMID ENTRY1 LS INSTALLATION Gap 1 5mm Gap 1 5mm INR27 LS INR27 LS 339mm 120mm L18...