HAPP 40
© 2013 HAPP Australia Pty Ltd
Version 8
22
|
P a g e
Carriages must be equal height from the floor before proceeding.
3. With the carriages in equal position from the floor, operators should route
the equalizer cables as shown below.
4. After the equalizer cables have been routed, adjust each cable so that they
are equal tension.
NOTE: The equalizer cables should be checked weekly for equal
tension. Failure to do this will cause uneven lifting. The cables
should always be adjusted so that they are equal tension when
resting on the safety locks.
STEP FOUR: (Mounting the power unit.)
Attach the power unit to the POWERSIDE COLUMN with supplied tolls and parts.
Fill the reservoir with hydraulic oil. Make sure the funnel used to fill the power
unit is clean. In summer and winter, you should change the oil.
STEP FIVE: (Installing Hydraulic Lines.)
1. Install the hydraulic lines as shown below, paying careful attention to keep the
hoses clean and free of debris.