
7
Bef
or
e star
ting
Installation
Op
er
ation
S
cr
een blo
ck
diagr
am
Function set
ting
Pr
ogr
am
Sy
stem set
ting
Sp
ecifications
▶Control
1) How to install DIN rail
① Connect the top hook(A) of bottom of
floor to the DIN rail and press it(B) in
order to install it.
② Check if it is fixed by pushing
up the mounting bracket.
Ⓑ
Ⓐ
TH510 series module can connect up to 7 units. Any module must be installed vertically.
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
●
How to install module
② Fix a module on
both ends using
stoppers.
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
TM-DO
ADR
PWR
RY2
RY6
RY1
RY5
RY3
RY7
RY4
RY8
③
① Push a module aside
in order to connect it to a
connector.
هﺮﮐ
ﮓﻧﺎﯿﻧﺎﻫ
تﻻﻮﺼﺤﻣ
یرﺎﺼﺤﻧا
هﺪﻨﯾﺎﻧﻤ
ناﻮﯿﺳ
ﺖﮐﴍ
021-33989001
www.sivancarno.com
021-33989002