
19
Bef
or
e star
ting
Installation
Op
er
ation
S
cr
een blo
ck
diagr
am
Function set
ting
Pr
ogr
am
Sy
stem set
ting
Sp
ecifications
1. Run screen
Fixed control / program operations can be changed from [main menu] - [temperature operation
setting] - [ operation setting ]. The operation start and finish can be executed from the operation
screens 1 and 2 only
No.
Description
1
Show the SD card status
2
Execute the hidden menu window. To cancel the menu window, clic the same part again
3
Move to Operation 2nd screen
4
Move to Main Menu screen
5
Show the temperature Present value (PV)
6
Show the temperature unit
7
Show the temperature control output (MV)
8
Input the temperature Target Set Value (TSG)
9
Show the temperature present set value (NSV). Show only during operation
10
Show the temperature increase/decrease/maintenance status
11
Show the humidity Present value (PV)
12
Show the humidity unit
13
Show the humidity control output (MV)
14
Input the humidity Target Set Value (TSG)
15
Show the humidity present set value (NSV). Show only during operation
16
Show the humidity increase/decrease/maintenance status
17
Start/Stop button
18
Show a status message about the overall operation
19
Show the operation time
1-1 Fixed control screen
Press the operation button in the left of the center in the fixed control screen in order to switch to the
fixed operation screen 1
②
⑩
⑦
③
④
⑫
⑯
⑱
⑲
⑬
①
⑥
⑤
⑪
⑰
⑧
⑭
⑨
⑮
Fig. 9) Fix stop mode screen 1
Fig. 10)Fix run mode screen 1
▶ Fixed control screen 1
هﺮﮐ
ﮓﻧﺎﯿﻧﺎﻫ
تﻻﻮﺼﺤﻣ
یرﺎﺼﺤﻧا
هﺪﻨﯾﺎﻧﻤ
ناﻮﯿﺳ
ﺖﮐﴍ
021-33989001
www.sivancarno.com
021-33989002