
61
Bef
or
e star
ting
Installation
Op
er
ation
S
cr
een blo
ck
diagr
am
Function set
ting
Pr
ogr
am
Sy
stem set
ting
Sp
ecifications
6 Points for temperature, 2 points for humidity are available for ON/OFF signal
1. L.SV
- Set lower limit of ON/OFF signal operation.
2. M.SV
- Set median of ON/OFF signal operation.
3. H.SV
- Set upper limit of ON/OFF signal operation.
4. LU
- Set lower limit offset of ON/OFF signal operation.
5. HD
- Set upper limit offset of ON/OFF signal operation.
▶ Temperature/Humidity setting
5. ON/OFF signal
Parameter
Setting range
Default
L.SV
Temperature EU (0 ~ 100)
0.0
M.SV
0.0
H.SV
0.0
LU
Temperature EUS (0 ~ 100)
0.0
HD
0.0
Parameter
Setting range
Default
L.SV
Humidity EU (0 ~ 100)
0.0
M.SV
0.0
H.SV
0.0
LU
Humidity EUS (0 ~ 100)
0.0
HD
0.0
[Temperature ON/OFF signal]
Humidity ON/OFF signal]
Fig. 88) ON/OFF – Temperature
Fig. 89) ON/OFF – Humidity
هﺮﮐ
ﮓﻧﺎﯿﻧﺎﻫ
تﻻﻮﺼﺤﻣ
یرﺎﺼﺤﻧا
هﺪﻨﯾﺎﻧﻤ
ناﻮﯿﺳ
ﺖﮐﴍ
021-33989001
www.sivancarno.com
021-33989002