39
5-4 Schedule Operation
1. Check and enter the schedule operation time.
For the directions, refer to page 49.
2. If selecting Schedule mode by pressing Schedule operation mode button once, the following screen is
displayed.
3. If pressing START button, it shows the following screen and the compressor operates and stops in
accordance with the schedule operation time.
Displaying the
pressure
detected
Displaying
start presure
Schedule operation stand-by screen
During schedule operation: the screen is displayed
when the compressor is stand-by before the
schedule operation time
Schedule operation screen
During schedule operation: if the compressor
operates at the time of schedule operation, the left
screen is displayed.
When the main motor rotates by schedule
operation, mark blinks.
GRH3 star-delta
User’s Manual
Содержание GRH 3 series
Страница 1: ...User s Manual of Compressor...
Страница 60: ...60 Hanshin 8 Control System 8 1 Compressor Configuration Layout 8 Control System...
Страница 62: ...62 Hanshin 8 Control System 2 Micom Controller GRH3 50A 100A...
Страница 63: ...63 GRH3 25A 30A 35A 50A Star delta GRH3 star delta User s Manual...
Страница 64: ...64 Hanshin 8 Control System GRH3 75A 100A Star delta...
Страница 74: ...74 Hanshin 12 Quality Warranty 13 Outside Drawing by Models 1 GRH3 20A 25A 30A 35A 13 Outside Drawing by Models...
Страница 75: ...75 2 GRH3 50A GRH3 star delta User s Manual...
Страница 76: ...76 Hanshin 13 Outside Drawing by Models 3 GRH3 75A 100A...
Страница 77: ...4 GRH3 75W 100W GRH3 star delta User s Manual 77 Appearance...
Страница 79: ......