9 PDI (Setup)
- 9.2 -
4. Cut the ties holding the hydraulic cylinder and
hoses to the Bale Processor body. Allow it to
swing freely.
As part of the shipping process, your Bale Processor (If equipped with a hydraulic deflector kit)
will require some setup. Please follow the steps below to get your Bale Processor set up for
use.
5. Rotate the Deflector Shield and the Hydraulic
Cylinder until the mounting holes align.
6. Install the Cylinder Mounting Pin removed in
step 2. Secure in place using the 3/8” bolt, flat
washer, and Nyloc nut removed in step 1.
Содержание 2958
Страница 2: ......
Страница 6: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...3 2 3 Safety Decal Locations...
Страница 15: ...3 3 3 Safety Decal Locations...
Страница 17: ...3 5 3 2 Information Decal Locations...
Страница 36: ...5 5 5 4 PTO...
Страница 43: ...7 3 Bolt Torque 38 7 2...
Страница 44: ...7 3 7 4 Overall Dimensions...
Страница 45: ...7 4 7 4 Overall Dimensions...
Страница 46: ...7 5 7 4 Overall Dimensions...
Страница 47: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...N 10 1...
Страница 53: ......
Страница 54: ...H S MFG CO Products approved for the FEMA SEAL OF QUALITY...