3. Slowly raise the tines until the bale
clears the ground.
4. Remove strings, twine, or wrapping
from the bale.
1. Lower bale tines to ground.
2. Back processor up with the bale
tines sliding under the bale.
- 4.8 -
5. Raise the bale tines up and tip the
bale into the bale cradle.
4.7 Field Operation
Содержание 2958
Страница 2: ......
Страница 6: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...3 2 3 Safety Decal Locations...
Страница 15: ...3 3 3 Safety Decal Locations...
Страница 17: ...3 5 3 2 Information Decal Locations...
Страница 36: ...5 5 5 4 PTO...
Страница 43: ...7 3 Bolt Torque 38 7 2...
Страница 44: ...7 3 7 4 Overall Dimensions...
Страница 45: ...7 4 7 4 Overall Dimensions...
Страница 46: ...7 5 7 4 Overall Dimensions...
Страница 47: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 52: ...N 10 1...
Страница 53: ......
Страница 54: ...H S MFG CO Products approved for the FEMA SEAL OF QUALITY...