21
80-150 kW Frame & Header Kits Manual
7.2 INSTALLER CONNECTIONS FOR UPMXXL BOILER PUMP
Refer to the W
iring Connection section in the boiler Installation Instructions for wiring details.
IMPORT
ANT
: Ensure the boiler pumps are wired to the boiler in order to ensure the boiler pump overrun facility is provided.
Ta
pe
b
ac
k
1
2
3
4
5
6
13
14
15
16
17
18
7
8
9
10
11
12
33
34
24
25
26
27
28
29
19
20
21
22
23
230
V
50
Hz
PE
LV
N
L
PE
L
IN
N
L3
/L
3
PE
N
L
M
odbus
CL
+
LP
B
P1
H1
GN
D
Op
en
Th
er
m
AU
X2
BX
3
BX
2
B9
B3
BS
B
PE
H5
QX
1
QX
2
QX
3
AU
X1
PE
N
L2
PE
N
L1
IN
PW
M
GN
D
DB
M
B
UP
M
XX
L
CL
-
G+
A+
A-
RE
F
40
41
42
36
35
37
38
39
30
31
32
Note
. Used on DN80 frame and header
kits using low loss headers or plate
heat exchangers.
Содержание Stratton mk3
Страница 23: ...23 NOTES 80 150 kW Frame Header Kits Manual ...