14
80-150 kW Frame & Header Kits Manual
6.2.1 INSTALLATION DRAWING WITH 1 - DN80 120 kW BOILER
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
6.2.2 INSTALLATION DRAWING WITH 1 - DN100 150 kW BOILER
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
NOTE: LOW LOSS HEADER OR PLATE HEAT EXCHANGER AND GAS
CONNECTIONS CAN BE LOCATED EITHER ON THE LH OR RH SIDE OF
THE ASSEMBLY TO SUIT THE REQUIREMENT OF THE INSTALLATION
NOTE: LOW LOSS HEADER OR PLATE HEAT EXCHANGER AND GAS
CONNECTIONS CAN BE LOCATED EITHER ON THE LH OR RH SIDE OF
THE ASSEMBLY TO SUIT THE REQUIREMENT OF THE INSTALLATION
(T
OP OF FR
A
ME)
1830
(T
OP OF BOILER)
1801
696
780
794
120
450
980
239
250
123
SYSTEM FLOW
DN100 PN6 FLANGE
SYSTEM RETURN
DN100 PN6 FLANGE
NOTE:
1. MIXING HEADER AND GAS CONNECTIONS CAN BE LOCATED
EITHER SIDE OF THE LHS OR RHS OF THE ASSEMBLY TO SUIT
THE INSTALLATION REQUIREMENTS.
2. OPTIONAL FRAME DN100 FLANGED PUMP (UIN 235596)
ONE PER BOILER.
3. OPTIONAL LOW LOSS HEADER (UIN 232877 DN100)
ONE PER CASCADE.
293
894
569
704
All dimensions in mm
All dimensions in mm
6.2 SIDE BY SIDE FRAME KIT CONFIGURATION
Содержание Stratton mk3
Страница 23: ...23 NOTES 80 150 kW Frame Header Kits Manual ...