![Hamworthy Stratton mk3 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/hamworthy/stratton-mk3/stratton-mk3_manual_3494096019.webp)
19
80-150 kW Frame & Header Kits Manual
6.2.11 INSTALLATION DRAWING WITH 6 - DN80 80-100 kW BOILERS (SIDE BY SIDE)
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
6.2.12 INSTALLATION DRAWING WITH 6 – DN100 150 kW BOILERS (SIDE BY SIDE)
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
SYSTEM FLOW
DN100 PN6 FLANGE
SYSTEM RETURN
DN100 PN6 FLANGE
704
(T
OP OF BOILER)
1801
(T
OP OF FR
A
ME)
1830
696
780
794
120
293
450
500
500
500
500
500
250
123
480
20
480
20
480
20
480
20
480
20
480
3480
3000
239
569
894
NOTE:
1. MIXING HEADER AND GAS CONNECTIONS CAN BE LOCATED
EITHER SIDE OF THE LHS OR RHS OF THE ASSEMBLY TO SUIT
THE INSTALLATION REQUIREMENTS.
2. OPTIONAL FRAME DN100 FLANGED PUMP (UIN 235596) ONE PER BOILER.
3. OPTIONAL LOW LOSS HEADER (UIN 232877 DN100)
ONE PER CASCADE.
All dimensions in mm
All dimensions in mm
Содержание Stratton mk3
Страница 23: ...23 NOTES 80 150 kW Frame Header Kits Manual ...