17
80-150 kW Frame & Header Kits Manual
6.2.7 INSTALLATION DRAWING WITH 4 – DN80 80-120 kW BOILERS (SIDE BY SIDE)
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
6.2.8 INSTALLATION DRAWING WITH 4 – DN100 150 kW BOILERS (SIDE BY SIDE)
(OPTIONAL LOW LOSS HEADER SHOWN FOR INFORMATION)
(T
OP OF FR
A
ME)
1830
(T
OP OF BOILER)
1801
696
780
794
120
450
2000
2480
239
569
250
500
500
500
123
SYSTEM FLOW
DN100 PN6 FLANGE
SYSTEM RETURN
DN100 PN6 FLANGE
894
293
480
480
480
480
20
20
20
704
NOTE:
1. MIXING HEADER AND GAS CONNECTIONS CAN BE LOCATED
EITHER SIDE OF THE LHS OR RHS OF THE ASSEMBLY TO SUIT
THE INSTALLATION REQUIREMENTS.
2. OPTIONAL FRAME DN100 FLANGED PUMP (UIN 235596)
ONE PER BOILER.
3. OPTIONAL LOW LOSS HEADER (UIN 232877 DN100)
ONE PER CASCADE.
All dimensions in mm
All dimensions in mm
Содержание Stratton mk3
Страница 23: ...23 NOTES 80 150 kW Frame Header Kits Manual ...