HG2200/HG2200AT Operator’s Manual
Plan Pull Path
58 - Prepare
Plan Pull Path
Plan the pull path, from entry to end, before job begins. Locate the entire route of the pipe to be replaced to
ensure a straight path. Expose all crossing or parallel utilities in accordance with local regulations.
Prepare Jobsite
Mark Pull Path
Mark your planned pull path with white flags or paint.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
274-050; 274-724 (2P), 700-133
To help avoid injury:
•
If jobsite classification is in question or the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
Содержание HG2200AT
Страница 1: ...TECHNICAL PUBLICATIONS Operator s Manual HG2200 HG2200AT Issue 2 1 960 1119 Original Instruction...
Страница 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Страница 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Страница 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Страница 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Страница 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Страница 136: ...HG2200 HG2200AT Operator s Manual Service Record 135 Service Record Service Performed Date Hours...
Страница 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Страница 138: ...HG2200 HG2200AT Operator s Manual Appendix 137 Appendix Chapter Contents Tire Safety Information...
Страница 146: ......