19
Étape/ Step 14
A)
Attach
a
Front
Upper
Shroud
Mount
Bracket
(59)
(with
the
horizontal
rib
facing
towards
outside
of
the
machine)
to
the
top
back
of
the
Right
and
Left
Front
Upright
(4R
&
4L)
using
2-
M6x12
Button
Head
bolts
(95)
and
2-
M6
washers
(101)
on
each
as
shown
.
Tighten
these
bolts
now
.
B)
Attach
the
Left
and
Right
Upper
Shroud
Mount
Brackets
(60
&
61)
to
the
Left
and
Right
Top
Beams
(16
&
15)
using
2-
M8x16
Button
Head
Bolts
(84)
and
2-M8
washers
(100)
on
each
as
shown
.
Leave
loose
.
These
will
be
tightened
in
Step
15
.
C)
Attach
an
Accessory
Hanger
Bracket
(49)
to
the
bottom/back
of
both
the
Left
and
Right
Top
Beams
(16
&
15)
using
2-
M6x12
Button
Head
bolts
(95)
and
2-
M6
washers
(101)
on
each
as
shown
.
Tighten
these
bolts
now
.
A)
Fixez
un
support
de
fixation
du
carénage
supérieur
avant
(59)
(avec
la
nervure
horizontale
tournée
vers
l'extérieur
de
la
machine)
vers
le
haut
en
haut
du
montant
avant
droit
et
gauche
(4R
et
4L)
en
utilisant
2-
Boulons
M6x12
(95)
et
2
-
Rondelles
M6
(101)
sur
chacune
comme
représenté
.
Serrer
ces
boulons
maintenant
.
B)
Fixez
les
supports
de
montage
de
la
gaine
gauche
et
droite
(60
et
61)
aux
poutres
supérieures
gauche
et
droite
(16
et
15)
à
l'aide
des
boulons
à
tête
borgne
2
M8x16
(84)
et
des
rondelles
2
M8(100)
.
Lâchez
.
Ceux-ci
seront
resserrés
à
l'étape
15
.
C)
Fixez
un
support
de
suspension
d'accessoire
(49)
au
fond
et
à
l'arrière
des
poutres
supérieures
gauche
et
droite
(16
et
15)
à
l'aide
de
deux
boulons
à
tête
M6x12
(95)
et
de
deux
rondelles
M6
(101)
.
Serrer
ces
boulons
maintenant
.
Содержание 103141
Страница 1: ......
Страница 5: ...04 3 2 Étapes d assemblage Assembly steps Étape Step 1 ...
Страница 10: ...09 Étape Step 6 ...
Страница 12: ...11 Étape Step 8 ...
Страница 15: ...14 Étape Step 9 2 ...
Страница 26: ...25 6 Vue éclatée Explosion drawing ...