Subject to change without notice
17
I m p o r t a n t h i n t s
whom you purchased your HAMEG instrument.
Customers from the Federal Republic of Germany
may directly contact HAMEG for warranty proces-
sing in order to speed up the procedure.
The proceeding of repairs during the warranty
period is subject to our terms of warranty which
are available on our web-site
http://www.hameg.com
Even after expiry of the warranty period please
do not hesitate to contact our HAMEG customer
service for repairs and spare parts.
Return Material Authorization (RMA):
Before sending back your instrument to HA-
MEG do apply for a RMA number either by fax
or on the Internet: http://www.hameg.de.
If you do not have suitable packaging for the
instrument on hand please contact the HA-
MAG sales department (Tel.: +49 (0) 6182/800
300, E-mail: [email protected]) to order an
empty original cardboard box.
Maintenance
The most important characteristics of the instru-
ments should be periodically checked according to
the instructions provided in the sections “Opera-
tional check and “Alignment procedcure. To obtain
the normal operating temperature, the mainframe
with inserted module should be turned on at least
60 minutes before starting the test. The specifi ed
alignment procedure should be strictly observed.
When removing the case detach mains/line cord
and any other connected cables from case of the
mainframe HM8001-2. Remove both screws on
rear panel and, holding case fi rmly in place, pull
chassis forward out of case. When later replacing
the case, care should be taken to ensure that
it properly fi ts under the edges of the front and
rear frames. After removal of the two screws at
the rear of the module, both chassis covers can
be lifted. When reclosing the module, care should
be taken that the guides engage correctly with the
front chassis.
Operation of the module
Provided that all hints given in the operating
instructions of the HM8001-2 Mainframe were
followed especially for the selection of the cor-
rect mains voltage start of operation consists
prac-tically of inserting the module into the right
or left opening of the mainframe. The following
pre-cautions should be observed:
Before exchanging the module, the mainframe
must be switched off. A small circle (o) is now
revealed on the red power button in the front
centre of the mainframe.
If the BNC sockets at the rear panel of the
HM8001-2 unit were in use before, the BNC cables
should be disconnected from the basic unit for
safety reasons. Slide in the new module until the
end position is reached.
Before being locked in place, the cabinet of the
instrument is not connected to the protective earth
terminal (banana plug above the mainframe mul-
tipoint connector). In this case, no test signal must
be applied to the input terminals of the module.
Generally, the HM8001-2 set must be turned on
and in full operating condition, before applying any
test signal. If a failure of the measuring equipment
is detected, no further measurements should
be performed. Before switching off the unit or
exchanging a module, the instrument must be
disconnected from the test circuit.