7  Instructions to the User

Instruct and demonstrate the safe and efficient operation of the boiler, heating system and domestic hot water system.

Advise the user, that to ensure the continued efficient and safe operation of the boiler, it is recommended that it is checked and
serviced at regular intervals.  The frequency of servicing will depend upon the particular installation and usage, but in general once
a year should be enough.

Draw attention, if applicable to the current issue of the Gas Safety (Installation and Use) Regulations, Section 35, which imposes
a duty of care on all persons who let out any property containing a gas appliance.

It is the Law that servicing is carried out by a competent person.

Advise the user of the precautions necessary to prevent damage to the system and building in the event of the heating system being
out of use during frost and freezing conditions.

Reminder - Leave these instructions and the “Benchmark” logbook with the user.

8  Servicing

REMEMBER, When replacing a part on this appliance, use only
spare parts that you can be assured conform to the safety and
performance specification that we require. Do not use
reconditioned or copy parts that have not been clearly authorised
by Halstead Boilers Ltd.

Products of Combustion Check

Note: To obtain a products of combustion reading, remove the
front panel and remove the control box as descibed in the
relevant paragraphs of section 4.12.   Next, remove the cap from
the sampling point, located on the top of the left hand side of the
inner casing, see diagram 8.1.

Connect the analyser tube on to the nipple.

WARNING.    The multifunctional control and fan operate on
mains voltage, terminals will become live.

Switch on the electrical supply and gas supply then operate the
boiler.

On completion of the test switch off the electrical supply and gas
supply, remove analyser tube and replace sampling point cap.

Servicing

Before servicing turn off the gas and isolate the electrical supply
to the boiler.

After completing a service always test for gas soundness, make
electrical checks and carry out functional check on controls.

Unless stated otherwise all parts are replaced in the reverse
order to removal.

8.1 Access

Remove the boiler front casing panel, refer to paragraph 6.8.

Remove the bottom plinth panel by unscrewing the two dog
point screws securing the panel to the boiler plinth, see diagram
8.4.

Disconnect gas valve from gas cock and unplug electrical plug
from gas valve, firstly removing electrical plug securing screw,
see diagram 8.2.

Unclip electrical wires from control box support bracket, see
diagram 8.3.

Undo the four self-tapping screws that secure the combustion
chamber front and carefully withdraw it together with the burner
and gas valve assembly, taking care not to strain the ignition
and earth wire, see diagram 8.5.

Note: When replacing burner in combustion chamber make
sure it fits correctly on the guides.

Diagram 8.2

0000

GAS
SERVICE
COCK
UNION

ELECTRICAL
PLUG

Diagram 8.1

0000

SAMPLE POINT

Disconnect the ignition and earth leads from the burner and
remove by drawing the leads though the grommet, see diagram
8.5.

Remove the three self-tapping screws from the lower part of the
control box support bracket, see diagram 8.6.

Undo the wing nut that secures the top of the heat shield and
carefully hinge down control box and heat shield, see diagram
8.6.

Release the two toggle latches that secure the boiler access
door and remove, see diagram 8.7.

SECURING
SCREW

Содержание BFF80

Страница 1: ...are an integral part of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f...

Страница 2: ...rovide information on substances hazardous to health Ceramic fibre Insulation Pads Glassyarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint y...

Страница 3: ...rvicingwilldependupon the particular installation conditions and usage but in general once a year should be enough It is the law that servicing must be carried out by a competent person If this applia...

Страница 4: ...ol wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic lighting sequence will operate again when heat is required It should be noted th...

Страница 5: ...in millimetres except as noted Approximate weight of complete boiler 131 5kg 290lb Water content 5 76 litre 1 27gallons Gas connection Rc1 2 1 2 in BSPT Water connection Rc1 1in BSPT Electrical supply...

Страница 6: ...sue of BS6891 The supply from the governed meter must be of adequate size to provide a steady inlet working pressure of 20mbar 8in wg at the boiler On completion test the gas installation using the pr...

Страница 7: ...t nothing will obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartmen...

Страница 8: ...m the boiler a minimum static head of 1metre 3ft3in must be provided between the water line of the feed tank and the centre of the waterway see diagram 2 2 2 5 Circulation Pump Normallythepumpshouldbe...

Страница 9: ...f if it is made of plastic sheeting If the car port consists of a roof and two or more walls seek advice from the local gas company before installing the boiler If the terminal is fitted within 600mm...

Страница 10: ...tional wall liner kit part no 900862 is available complete with instructions All flue assemblies are designed for internal installation Make sure that the ductings do not slope down towards the boiler...

Страница 11: ...al restrictor and secure with locking screw but do not tighten see diagram 4 5 Engage the terminal restrictor on the flue terminal by hooking it over the terminal end and engaging the clamping bracket...

Страница 12: ...f the three remaining lower connections may be used for the gravity domestic hot water return Fit plugs into any unused boiler tappings 4 7 Water Connections Fully Pumped Systems Fit suitable fittings...

Страница 13: ...e that it will clear the boiler air duct and if working to minimum clearance does not project too far from the boiler see diagram 4 11 Do not route any pipework water or gas across the front of the co...

Страница 14: ...ory with the control box and heat shield fitted in the lower casing height position 9863 SIDE CASINGS FITTING Diagram 4 14 MAX SIDE CASING R H MIN BOILER PLINTH FRONT CASING BRACKET No 8 SCREW 4 LOCAT...

Страница 15: ...to the rear flue outlet of the boiler using the self tapping screws provided see diagram 4 3 IMPORTANT WithregardstotheManual HandlingOperations 1992 Regulations the following operation exceeds the re...

Страница 16: ...r any water leaks and put right Make the gas connection to the service cock at the lower left hand side of the boiler see diagram 1 1 The whole of the gas installation including the meter should be in...

Страница 17: ...amp Make sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the eart...

Страница 18: ...iagram 6 1 BOILER COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J DA...

Страница 19: ...dependent on the heat setting Turn the boiler temperature control fully anti clockwise to 0 Isolate from the electrical supply Remove the pressure gauge from the test point and refit screw making sure...

Страница 20: ...operate on mains voltage terminals will become live Switch on the electrical supply and gas supply then operate the boiler On completion of the test switch off the electrical supply and gas supply rem...

Страница 21: ...sliding back to disengage the retaining lugs then lift up see diagram 8 7 Remove the flue hood When replacing the flue hood ensure that it rests on the guides and that the rear of flue hood is located...

Страница 22: ...g the relevant instructions in sections 8 3 and 8 4 8 3 Burner and Injector Remove the two screws and nuts securing the burner support bracket to the combustion chamber cover see diagram 8 9 Remove th...

Страница 23: ...ult persists continue with fault finding below Before carrying out fault finding ensure that gas electricity and water are available at the boiler Is neon 1 lit NO Check power supply Is neon 2 lit NO...

Страница 24: ...ve the control box cover refer to section 5 1 Refer to Boiler Fault Finding see diagram 9 1 Fault Finding Wiring Diagram see diagram 9 3 Pictorial Wiring Diagram see diagram 9 4 9 2 Electrical Supply...

Страница 25: ...3 NEON 4 NEON 5 NEON 6 NEON KEY see P C B FAN P C B CONTROL BOARD GAS CONTROL VALVE TERMINAL BLOCK THERMISTOR AIR PRESSURE SWITCH NEON 1 NEON 5 NEON 4 NEON 6 NEON 2 NEON 3 F4A FUSE p y g p b bk bk bk...

Страница 26: ...Control Board P C B Remove front panel to gain access see section 6 8 Remove control box lid by undoing the four securing screws two on control box two on the heat shield and lift off see diagram 10 1...

Страница 27: ...t the air pressure tubes are fitted with the clear tube from the air pressure switch to the front fan connection as shown in diagram 10 5 and the electrical connections are made as shown in wiring dia...

Страница 28: ...g any spare part please quote the part number and the description from the list together with the model name and serial number information from the data label The data label is positioned on the heat...

Отзывы: