background image

97095C (Rev. E - 10/99)

PAGE 3

RC8*C  RC12*C  AND 14762 & 14700 CUP DISPENSER

1.  Familiarize yourself with the RC Wallframe which should already be in place in the wall.  If not, refer to the “RC Wallframe” Installation

Instructions before proceeding.

2.  Determine location of rough plumbing.  At this point, you should decide which style trap you plan to use.  For easier installation, we

recommend the use of a swivel trap.

3.  Install the basin (See Fig. 6).  Hold the basin flush against the wall, positioning the top edge just above the upper edge of the wallframe.

Then slide the basin down slowly until it engages the hanger bracket.  Be sure the basin is firmly engaged before releasing it.

4.  Finish securing basin in place.  Align the brackets at the bottom of the basin with the bracket on the frame.  Fasten the brackets together

using screws and speednuts (provided with fountain).

5.  Install tailpiece assembly.  Slide the slip nut and gasket from the trap onto the tailpiece.  Insert the tailpiece assembly into the trap and

align its other end with the drain hole in the basin.  Place rubber gasket between the tailpiece assembly and the basin, then screw in the

drain plug from above.  Tighten the drain plug.  Tighten slip nut and swivel joint.  Snap the strainer plate into the drain plug.

6.  Install a service stop (not provided) on the supply water inlet line.  Turn on supply water and flush thoroughly.

7.  Install refrigeration unit.  Slide refrigeration unit into the wallframe and position tight against left side and flush with the front edge of

wallframe.  WARNING: Adequate space must be maintained behind the refrigeration unit for air circulation.

8.  Water supply connections (See Fig 7 & 8)

A. RC8A Models – Connect service stop to tube marked “Water Inlet” on remote chiller.  Make connection from chiller “Cold Water Outlet”

tube to regulator valve assembly using the provided elbow and strainer.

B.  RC12A Models – Connect service stop to precooler/tailpiece assembly inlet tube.  Connect precooler/tailpiece assembly outlet tube to

tube marked “Water Inlet” on remote chiller.  Make connection from chiller “Cold Water Outlet” tube to regulator valve assembly using the

provided elbow and strainer.

9.  GF Model Only.  Connect glass filler line to outlet on tee located between strainer and regulator valve assembly. (See Fig. 7A & 8A)

10. Open service stop and operate push button to purge air.  Check thoroughly for leaks.

11. Check stream height from bubbler.  Stream height is factory set at 45 – 50 PSI.  If supply pressure varies greatly from this, remove

items 17 & 18 and adjust screw on regulator (item 14).  Clockwise adjustment will raise stream height and CCW adjustment will lower

stream height.  For best adjustment, stream height should be approximately 1-1/2” (38mm) above the bubbler guard. (See Fig. 15)

12. Connect refrigeration unit to electrical supply and check for proper operation.  WARNING:  Adequate space must be maintained behind

the refrigeration unit for air circulation.

13. Attach regulator holder (item 13) to grill (item 3) with hex nut (item 16).  Hold grill and engage angle on top edge of grill with lower edge

of basin.  Swing bottom of grill into place against the wall and securing grill mounting screws (provided).

FIG. 6

INSTALLATION INSTRUCTIONS

FOR THE

RC MODELS DRINKING FOUNTAIN

(refrigerated and non-refrigerated)

Содержание RC8*C Series

Страница 1: ... FIG 2 IMPORTANT INSTALLER PLEASE NOTE THE GROUNDING OF ELECTRICAL EQUIPMENT SUCHAS TELEPHONE COMPUTERS ETC TOWATER LINES IS ACOMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTOAFOUNTAIN CREATING AN ELECTROLYSIS WHICH CAUSESAMETALLIC TASTE ORAN INCREASE IN THE METAL CONTENT OF THE WATER THIS CONDITION IS AVOID...

Страница 2: ...r Models Install rough plumbing to cup dispenser See Fig 13 for location of waste water outlet 5 Cut plastic ties holding chiller shelf support rods to framework 6 Install wall frame assembly in wall opening with front edge of frame flush with finished wall face Secure frame through holes in top and sides to wall support members with 5 16 diameter fasteners bolts or lag screws as required by wall ...

Страница 3: ...RNING Adequate space must be maintained behind the refrigeration unit for air circulation 8 Water supply connections See Fig 7 8 A RC8A Models Connect service stop to tube marked Water Inlet on remote chiller Make connection from chiller Cold Water Outlet tube to regulator valve assembly using the provided elbow and strainer B RC12A Models Connect service stop to precooler tailpiece assembly inlet...

Страница 4: ...Y CONNECTIONS RC12A 12AGF MODELS TO BUBBLER CHILLER OUTLET 27 19 24 25 FIG 7 FIG 7A FIG 8 FIG 8A TO BUBBLER CHILLER INLET CHILLER OUTLET 27 19 24 25 TO BUBBLER CHILLER INLET CHILLER OUTLET 27 19 24 25 TO GLASSFILLER TO GLASSFILLER TO BUBBLER CHILLER INLET CHILLER OUTLET 27 19 24 25 CHILLER INLET Item 3 Page 7 Item 3 Page 7 ...

Страница 5: ...ignment with previously installed drinking fountain Be sure to check for proper operation of access door before securing unit in place Securing can be done through slots provided using screws or bolts as required by wall construction 3 Replace waste bin FIG 9 FIG 10 PLUMBING ROUGH IN CUP DISPENSER WITH GLASS FILLER NOTE If wall opening height has been adjusted to meet local codes see Step No 1 of ...

Страница 6: ...od alignment with fountain Open and close door to ensure proper operation CAUTION Do not suspend cup dispenser via the mounting slots be sure to shim along bottom edge to bear the weight of the cup dispenser 6 Secure cup dispenser in place Use lag screws or bolts as required by wall construction 7 Install glass filler supply tube assembly Figure 11 Put glass filler fitting through hole provided in...

Страница 7: ...p Nut Hex Washer Fibre Gasket Drain Gasket Slip Nut Nut Hex Strainer Plate Tailpipe 1 1 4 x 4 Nut Slip 1 1 2 Plug Drain 1 1 2 FIG 12 FIG 13 10 BASIN 9 11 13 7 8 12 1 3 2 4 5 6 See Fig 12 IMPORTANT Fountain and glassfiller are rated for a supply pressure of 90 PSI minimum If supply pressure exceeds this a pressure reducing regulator should be installed on the supply line Minimum supply pressure 15 ...

Страница 8: ...me Cover Nut Aztec Gold Strainer Screw 8 x 3 4 Type AB Elbow Drain Nut Slip Joint 1 1 4 Gasket Drain Tube Cu 3 8 x 4 75 Tube Cu Regulator In Tube Assy Bubbler 8880 Fitting Elbow TROUBLE SHOOTING AND MAINTENANCE CAUTION Cleaning of Aztec Gold Models requires special care Outer surfaces must be cleaned with a mild detergent or mixture of vinegar and water only rinsed and wiped dry Abrasive and acidi...

Отзывы: