background image

6LE002957B

5. Electrical installation

a.  Power supply

Power terminal block (230V/32A) for rigid cable of max. 10 mm².
Control terminal blocks of transmitter coils for rigid cable of max. 1.5 mm².
Power supply terminal block (230V) of the controller for rigid cable of max. 

1.5 mm². 

b.  Maximum power load

The maximum power load is determined using the encoder wheel that can 

be turned to the desired amperage.
If the LED indicator light is a solid red, turn off the power, wait for 15 

seconds and then change the position of the encoder wheel to an 

authorised threshold. 
Then, turn on the terminal: a steady green light should light up.

-X1: 1/2

N

Three-phase power

supply 1

(-X1/-X2)

Controller power

supply

MZ203 Trigger circuit

connection

(-X3)

Three-phase power

supply 2

(-X3/-X4)

L1 L2 L3

N L1 L2 L3

N LST

N

N LST

L1

-X0:1

-X0

-X0:3

-X2: 3/4

MZ203 trigger circuit

connection

(-X1)

Wiring diagram (version-specific)

Maximum 

charging 

rate

3P station

1P station

6 A

Not authorised by ZE Ready 

1.2

Not authorised by ZE Ready 

1.2

10 A
13 A
16 A
20 A
25 A
32 A
40 A

Prohibited for the electrical safety of the terminals

50 A
63 A

y

o

PIN

7

Содержание XEV6 Series

Страница 1: ...e installed only by a professional electrician fitter according to local applicable installation standards Conform to SELV installation rules 2 General description Strip light RFID Card Reader Socket...

Страница 2: ...rises the following parts Contact detection fixed on the contactor Controller MID energy meter version specific Grommet plate Controller power supply Terminal blocks 3 M3T2S socket lockable 1 M3T2S so...

Страница 3: ...6LE002957B 4 Attachment and connection a Diagrams for wall drilling without wiring space at the rear 713 765 1300 max 480 330 2 0 2 355 233 87 50 1395 max 235 4x not included 1 1 3...

Страница 4: ...6LE002957B b Diagrams for wall drilling with wiring space at the rear for XEV427 713 765 480 330 2 0 2 355 1300 max 233 87 50 1395 max 435 235 8 5 54 4x not included 2x 2x XEV427 4...

Страница 5: ...428 Terminal Installation Area 1472 1239 1089 2 0 2 1 7 5 355 175 110 325 650 325 70 350 250 190 250 500 250 Foundation C20 25 X0 Depth 80 cm Bedding Layer 5 cm C8 10 XEV426 In case of a chemical seal...

Страница 6: ...B The terminal MUST be mounted on its base BEFORE attaching the vector cabinet The equipotential bonding must be established between the terminal foot and base O 6 Earthing point to connect to the ear...

Страница 7: ...power wait for 15 seconds and then change the position of the encoder wheel to an authorised threshold Then turn on the terminal a steady green light should light up X1 1 2 N Three phase power supply...

Страница 8: ...pe A 40 A C curve 30 mA type A 40 A C curve 30 mA type B 40 A C curve 30 mA type B protections for the controller supply protections for the controller supply protections for the controller supply pro...

Страница 9: ...n TN or TT neutral point connection OK neutral point connection neutral point connection neutral point Max 50 Max 50 for the 5 stations Max 5 stations on 1 earthing connection Interconnection Electric...

Страница 10: ...Factory setting depending on the meter of sockets 3 and 4 Network_failure 0 1 0 Restricted access with recognised badges 1 Free access with compatible badges Access type in the absence of a network c...

Страница 11: ...http address of the OCPP server Depending on OCPP server configuration client Not active cpref N characters Terminal name seen from the OCPP server Default MAC address AttachedCable 0 1 Jumper cable A...

Страница 12: ...1 and C2 C1 C2 Creation modification of a whitelist or a super user from the file Retrieve the b1237 badges txt file by inserting a blank USB key and rename it b1237 whitelist txt You can then directl...

Страница 13: ...d management signal to the station s PINs 50 and 51 Edit the b1237 global cfg file as follows System y Pin 50 and 51 If 1 Partial charging override If 2 Full charging override Note in this case any ch...

Страница 14: ...lerance standard Flashing red 6x cycle Fault Defective communication between station and EV earthing fault earthing is cut but CP is looped via Neutral Flashing red 6x cycle Fault Defective communicat...

Страница 15: ...nication 3 Electric vehicle is overcharged The EV does not comply with the power limit set by the station 4 Ventilation required The vehicle requires additional ventilation the charging is blocked 5 F...

Страница 16: ...ation standards Conform to SELV installation rules Usable in all Europe M and in Switzerland Correct Disposal of this product Waste Electrical Electronic Equipment z Applicable in the European Union a...

Отзывы: