07
08
Similarly, take the second set of ladders
E1
,
E2
and
E3
and fit on the starboard side of the funnel. When you
are happy with the fit, glue the pegs in place.
Check the fit of one set of ladders
E1
,
E2
and
E3
on
the port side of the funnel, positioning them as
shown, with the pegs located in corresponding holes
in the funnel. Glue the pegs in place.
Take forward superstructure and the radar antenna
76-12
. Check the fit of part
76-12
: two tabs fit into
corresponding holes on the radar unit
37-02
. Part
76-12
protrudes above part
37-02
. Glue in place.
Glue the two hull supports
76-07
and
76-08
to the
hull support base
76-09
. Note that the supports are
labelled “front”.
You can now position the hull assembly on the four
support stands that have been assembled. Make sure
that the labelled sides of the hull supports are facing
towards the bow of the hull assembly.
Completed work
We have continued assembly on three parts of the
model: the funnel, the forward superstructure and the
upper deck. We have also built a fourth support stand.
76-09
76-12
37-02
76-09
E1
E2
E3
E3
E2
E1
76-07
76-08
06. RADAR ANTENNA AND SUPPORT STAND
01
02
03
28
27
AGORA
MODELS
28
AGORA
MODELS