03
04
The first small rope reel
76-02
is fitted at the front of
the upper deck
19-01
, on the port side of the turret
Bruno. Glue in place, as shown.
01
02
Take a crane boom
76-05
plus a trolley
C2
and hub
C3
from frame
76-06
. These parts will be used to
assemble the port aircraft transfer crane. Note that
parts
C2
and
C4
are mirror images of each other –
make sure you have the correct one.
The trolley
C2
fits on to the tab on the lower edge of
the crane boom
76-05
; the hub
C3
fits on to the pin
at the bottom of the crane boom. Glue in place. It may
help to label this as the port crane.
05
06
The next two small rope reels
76-02
are fitted on the
other side of the turret Bruno. Note how they are
positioned at right angles to each other. Fix in place
with a little superglue.
The last two small rope reels
76-02
are fixed centrally
in front of the bridge on superstructure deck
21-01
.
Glue in place as shown.
19-01
19-01
76-02
76-02
C3
C2
76-05
C3
C2
76-02
76-02
21-01
76-05
03
. AIRCRAFT TRANSFER CRANES
The second small rope reel
76-02
is glued to the
upper deck section
19-01
, close to the first rope reel.
24
23
AGORA
MODELS
24
AGORA
MODELS