4.4 Install the lanyard
Install the lanyard to safely hold the meter. Refer to
Figure 5 Lanyard installation
4.5 Install the probe and USB port plugs
Install the port plugs in the probe port(s) and USB port when the ports are not in use to keep the
enclosure rating of the instrument. Refer to
Note:
shows a meter with three probe ports. Some meter models have only one or two probe ports.
Figure 6 Port plug installation
English
11
Содержание HQ1110
Страница 1: ...DOC022 53 80629 HQ1110 HQ1130 HQ1140 HQ2100 HQ2200 HQ4100 HQ4200 HQ4300 08 2020 Edition 1 User Manual...
Страница 2: ......
Страница 12: ...Figure 4 Connect to the USB power adapter or a PC 10 English...
Страница 37: ......