Prepare for shipping
To prepare the analyzer for shipping, do the steps that follow.
Items supplied by the user:
Deionized water in two
beakers
Cross-slotted
screwdriver
Original
packaging
Flat-bladed screwdriver,
medium
1.
Remove the reagents from the reagent lines as follows:
a.
Remove the indicator bottle cap (red) and the buffer bottle cap (black) from the reagent
bottles.
b.
Remove the reagent bottles.
c.
Put two bottles (or beakers) that contain deionized water on the reagent tray.
d.
Put the indicator cap tubing and the buffer cap tubing in the deionized water.
e.
Push
menu
. Select Maintenance>Prime reagents two times.
The reagents are removed from the reagent lines.
2.
Remove the deionized water from the reagent lines as follows:
a.
Remove the indicator bottle cap (red) and the buffer bottle cap (black) from the deionized
water bottles.
b.
Remove the deionized water bottles from the analyzer.
c.
Push
menu
. Select Maintenance>Prime reagents three times.
All of the liquid is removed from the reagent lines.
3.
Select Power>shut down.
4.
Wait for the analyzer to shut down. When the display is off, disconnect the power cord from the
electrical outlet.
Note: For user safety, the analyzer will automatically go back to idle mode if the power cord is not disconnected
in 5 minutes or less after the display goes off.
Note: When power is removed from the analyzer for more than 10 minutes, a power-loss beep is heard at the
remote indicator for approximately 5 minutes.
5.
Turn the shut-off valve clockwise to stop sample flow to the analyzer.
6.
Disconnect the sample inlet (black) tubing and drain (clear) tubing from the analyzer. Do not
disconnect the small diameter tubing from the metal fitting on the bottom of the analyzer.
7.
Remove the pump clamp. Refer to
on page 63. Keep the pump clamp for shipment with
the analyzer.
8.
Drain the water from the colorimeter as follows:
a.
Remove the thumbscrew from the colorimeter.
b.
Lift the colorimeter off of the base.
c.
Tilt the colorimeter backward 90 degrees so that the water in the chamber drains out the
opening in the back.
d.
Tilt the colorimeter forward and backward two times to remove most of the water. Do not
shake the colorimeter.
e.
Attach the colorimeter back to the base with the thumbscrew.
9.
Disconnect the remote indicator cable and the Ethernet cable from the analyzer. Refer to
Analyzer electrical installation
on page 37.
64
English
Содержание CM130
Страница 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Страница 2: ......
Страница 18: ...Figure 9 Analyzer dimensions 16 English...
Страница 65: ...Figure 22 Remove the pump clamp English 63...
Страница 77: ...English 75...
Страница 79: ...English 77...
Страница 80: ...78 English...
Страница 81: ...English 79...
Страница 82: ...80 English...
Страница 83: ...English 81...
Страница 84: ...82 English...
Страница 85: ...English 83...
Страница 86: ...84 English...
Страница 87: ...Appendix C Screens Data export This appendix shows the analyzer display screens for reference only English 85...
Страница 88: ...86 English...
Страница 90: ...88 English...
Страница 92: ...90 English...
Страница 94: ...92 English...
Страница 95: ...English 93...
Страница 96: ...94 English...
Страница 98: ...96 English...
Страница 99: ...English 97...
Страница 100: ...98 English...
Страница 101: ...English 99...
Страница 102: ...100 English...
Страница 103: ...English 101...
Страница 104: ...102 English...
Страница 105: ...English 103...
Страница 106: ...104 English...
Страница 107: ...English 105...
Страница 111: ......