![Hach CM130 Скачать руководство пользователя страница 29](http://html2.mh-extra.com/html/hach/cm130/cm130_user-manual_3212248029.webp)
Remote indicator mounting
N O T I C E
In accordance with UL 61010-1, the remote indicator must be installed 1.5 m (4.9 ft) or more from patients in the
hemodialysis treatment room.
Attach the remote indicator to a wall or ceiling in the treatment room. The fasteners are supplied by
the user.
Note: An illustration is supplied for each step number starting at step 3.
1.
Identify the installation location for the remote indicator.
2.
Put the cable for the remote indicator through the wall or ceiling from the analyzer to the
installation location of the remote indicator.
The cable is supplied by the user. Refer to
on page 3 for the cable specifications.
English
27
Содержание CM130
Страница 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Страница 2: ......
Страница 18: ...Figure 9 Analyzer dimensions 16 English...
Страница 65: ...Figure 22 Remove the pump clamp English 63...
Страница 77: ...English 75...
Страница 79: ...English 77...
Страница 80: ...78 English...
Страница 81: ...English 79...
Страница 82: ...80 English...
Страница 83: ...English 81...
Страница 84: ...82 English...
Страница 85: ...English 83...
Страница 86: ...84 English...
Страница 87: ...Appendix C Screens Data export This appendix shows the analyzer display screens for reference only English 85...
Страница 88: ...86 English...
Страница 90: ...88 English...
Страница 92: ...90 English...
Страница 94: ...92 English...
Страница 95: ...English 93...
Страница 96: ...94 English...
Страница 98: ...96 English...
Страница 99: ...English 97...
Страница 100: ...98 English...
Страница 101: ...English 99...
Страница 102: ...100 English...
Страница 103: ...English 101...
Страница 104: ...102 English...
Страница 105: ...English 103...
Страница 106: ...104 English...
Страница 107: ...English 105...
Страница 111: ......