![Hach CM130 Скачать руководство пользователя страница 31](http://html2.mh-extra.com/html/hach/cm130/cm130_user-manual_3212248031.webp)
4.
Use a drill to make the mounting holes for the backplate. Make the hole diameter applicable to
the fasteners used.
a. Ceiling mount:
Make a two-hole pattern 72.4 mm (2.85 in.) wide with the cable opening in
the middle. Put the holes at least 37.4 mm (1.47 in.) in front of the cable opening.
b. Wall mount:
Make a two-hole pattern 133.4 mm (5.25 in.) long that is 50.8 mm (2 in.) below
the cable opening. Align the holes vertically.
English
29
Содержание CM130
Страница 1: ...DOC023 53 80540 CM130 11 2018 Edition 5 User Manual...
Страница 2: ......
Страница 18: ...Figure 9 Analyzer dimensions 16 English...
Страница 65: ...Figure 22 Remove the pump clamp English 63...
Страница 77: ...English 75...
Страница 79: ...English 77...
Страница 80: ...78 English...
Страница 81: ...English 79...
Страница 82: ...80 English...
Страница 83: ...English 81...
Страница 84: ...82 English...
Страница 85: ...English 83...
Страница 86: ...84 English...
Страница 87: ...Appendix C Screens Data export This appendix shows the analyzer display screens for reference only English 85...
Страница 88: ...86 English...
Страница 90: ...88 English...
Страница 92: ...90 English...
Страница 94: ...92 English...
Страница 95: ...English 93...
Страница 96: ...94 English...
Страница 98: ...96 English...
Страница 99: ...English 97...
Страница 100: ...98 English...
Страница 101: ...English 99...
Страница 102: ...100 English...
Страница 103: ...English 101...
Страница 104: ...102 English...
Страница 105: ...English 103...
Страница 106: ...104 English...
Страница 107: ...English 105...
Страница 111: ......