   3

INSTALLATION OF VERTICAL TRACKS

STEP 3

Position bottom section in center of the opening, allowing equal distance from each side of the opening.

STEP 4

Position left hand track over rollers as shown in Figure 4. Space track 1/2” from door as shown.
Before attaching vertical track angle or brackets to jambs it must be plumb and parallel to door and raised to match leveling of 
bottom door section.
Attach vertical track angles to jambs by welding or by using 1/4” self drilling screws on steel jambs or 5/16" x 1 1/ 2” hex 
head lag screws on wood jambs. If mounting directly to masonry, anchors are not supplied.
Repeat above step for right hand track. (Note: Both tracks must be parallel for proper operation)

Insert rollers into end hinges.
Hook rollers into vertical track and swing end 
hinges onto door section as shown at left.
Secure with fasteners provided.

STEP 5

Place #2 section on top of bottom section.   Note: if door is supplied with cylinder lock, use section with lock holes punched 
or drilled in it (see Step 19 on page 8). 
Attach hinges and rollers as shown in Figure 5. See hinge schedule Figure 6 on page 4 for correct placement of numbered 
hinges.  If inside lock is supplied, see Figure 7.

Содержание 610

Страница 1: ...COMMERCIAL COMMERCIAL SERIES OPERATION MAINTENANCE MANUAL COMMERCIAL 600 SERIES ...

Страница 2: ......

Страница 3: ......

Страница 4: ...ooth Steel 633 20 1 3 8 34 9mm 13 45 18 2 16 0 Steel 20 GA V Groove Smooth Steel 20 GA V Groove Smooth Steel 660 672 682 1 3 8 34 9mm 13 45 18 2 16 0 Extruded End Cap 26 GA V Groove Woodgrain Steel 26 GA Ribbed Short Panel Woodgrain Steel 661 671 681 1 3 8 34 9mm 13 45 18 2 16 0 Extruded End Cap 26 GA V Groove Woodgrain Steel 26 GA Recessed Short Panel Woodgrain Steel 663 673 1 3 8 34 9mm 13 45 18...

Страница 5: ......

Страница 6: ... Instructions Thoroughly Before Starting Installation Supplimental Instructions Now Included American Tradition Hardware Painting Instructions CA Full View Strut Installation Commercial Bearing Plate Installation Cylinder Lock Assembly KCLA Drilling Templates Lift Handle Step Plate Instructions Snap Latch Instructions Vertical Lift Handle Step Plate Instructions ...

Страница 7: ...se angle The door should be 2 wider than opening STEP 2 Attach hardware to bottom section with 1 4 x 3 4 hex head sheet metal screws see Figure 3 If door requires struts see Figure 8 on page 4 All vertical jambs and pads regardless of type must extend to top of headroom requirement S S W W 2 X 6 Wood Jambs Section W Steel Jambs Section S Steel Channel 3 Min W W S S Opening Width Interior Elevation...

Страница 8: ...g 1 4 self drilling screws on steel jambs or 5 16 x 1 1 2 hex head lag screws on wood jambs If mounting directly to masonry anchors are not supplied Repeat above step for right hand track Note Both tracks must be parallel for proper operation Insert rollers into end hinges Hook rollers into vertical track and swing end hinges onto door section as shown at left Secure with fasteners provided STEP 5...

Страница 9: ...es as shown in Figure 8 Top section strut is located directly above the top roller brackets secured at the ends with tech screws Secure all struts to center stiles through existing holes utilizing tech screws Note Doors over 14 2 wide require one strut per section STEP 9 STANDARD LIFT TRACK Attach bearing brackets to the horizontal angles with 3 8 x 3 4 bolts nuts Form rope loops to a convenient o...

Страница 10: ... track Plumb track and attach to wall in same manner as lower vertical tracks Heads of machine screws should be to inside of the tracks as shown in Figure 9b Jamb fasteners must be installed with no more than 48 between each fastener Now set bearing brackets against the plumb lines and attach brackets securely to the track and wall STEP 10 HORIZONTAL TRACK SUPPORT Replace temporary support hangers...

Страница 11: ...ns STEP 12 COUNTERBALANCE INSTALLATION Determine what type of spring assembly you have as shown in figures 12 13 14 or 15 STEP 13 Place the center support bracket and the bearing on the axles as shown in Figure 16 bearing sits inside spring fitting Bolt spring fitting s to center support bracket see Figure 16 or 17 using 3 8 dia x 1 1 2 hex head bolts Slide a cable drum on both ends of shaft Be su...

Страница 12: ...mber of turns The number of turns are indicated on the spring tag attached to the spring assembly For example if the tag says wind spring 7 turns 7 x 4 28 one quarter turns are required to balance Note each complete turn will cause the chalk line to make one spiral After the requred number of 1 4 turns have been made tighten both set screws in the winding cone to secure it to the shaft before remo...

Страница 13: ...ckets where cable is attached be performed by qualified door service personnel only see notice below Important Safety Notice Operate door only when properly adjusted and free of obstructions Door is under extreme spring tension Repairs and adjustments especially to cables and spring assembly can be hazardous and should be performed by qualifled door service personnel only Do not permit children to...

Страница 14: ...Damages resulting from other causes beyond the manufacturers control In the event any defect is claimed during the warranty periods a claim in writing must be submitted to Haas Door Company directed through an authorized Haas Door Company dealer or installer This claim must be submitted within fifteen 15 days of the discovery of the suspected defect The door and all components must be available fo...

Отзывы: