HINGE SCHEDULE
STEP 6
Complete the remainder of the sections at this time. Top
door section should only be installed after horizontal track or
full vertical track has been installed.
Note: if door is supplied with full view aluminum section(s),
attach hinges with 1/4” self drilling screws provided.
STEP 7 SLIDE BOLT LOCK
The inside lock is installed on the end stile of the second
section so the slide bolt rests against the top of one of the
rectangular engaging slots in the vertical track (see Figure 7).
If door is supplied with cylinder lock, see page 8.
STEP 8 STRUT INSTALLATION
All struts except top section strut are attached with tech
screws below hinges as shown in Figure 8. Top section strut
is located directly above the top roller brackets, secured at
the ends with tech screws. Secure all struts to center stiles
through existing holes utilizing tech screws.
Note: Doors over 14’-2” wide require one strut per section.
STEP 9 STANDARD LIFT TRACK
Attach bearing brackets to the horizontal angles with 3/8” x
3/4” bolts & nuts. Form rope loops to a convenient overhead
structural member & insert horizontal tracks through them,
then attach bottom of the curved portions of track to the top
of the vertical tracks at the splice brackets with 1/4” x 5/8”
truss head machine screws & nuts. Head of machine screws
should be to inside of the track (see Figure 9). Using a level,
strike a plumb line from the inside of the splice bracket to
the inside of the horizontal angle on each side. Place outside
edges of bearing brackets against the plumb lines and attach
brackets securely to the wall (see Figure 9).