1
96-0198 Rev V
March 2012
Installation
NOTE: Use these installation recommendations with those in the
Vertical Mill Reference Manual. Information supplied here is
given speciically for the Ofice Mill.
The following steps are necessary to install an Ofice Mill.
1. Unwrap the shipping material and lift the machine from the pallet.
2. Install the optional casters if they are included.
3. Move the Ofice Mill to where it will be operating.
4. Remove the shipping brackets.
4. Connect power and air.
5. Rough-Level the Ofice Mill.
6. Do a spindle sweep.
7. Run-in the spindle.
Lift The Machine
Refer to the Vertical Mill Reference Manual for information on machine lifting.
Install Casters (Optional)
Attach the casters to each side of the machine using the included socket head cap screws
through the inside of the Ofice Mill base.
Move the Ofice Mill
Warning
The Ofice Mill has a high center of gravity. Move the
machine slowly and carefully to prevent it from falling
over.
Without an Optional Caster Kit
1. You will need a pallet jack that has at least 1500 lb capacity and forks that will it in
the space between the Ofice Mill’s leveling pads (24.5", 622 mm).
2. Lift the Ofice Mill from the side opposite the control cabinet. Carefully move the
Ofice Mill to its operating location and lower it onto the leveling pads.
Leveling Pads
24-1/2 (622 mm)
Pallet Jack
Pendant Arm Shown
in Shipping Position
Control
Cabinet
SIDE VIEW
Содержание OFFICE MILL
Страница 1: ...OFFICE MILL OPERATOR S ADDENDUM 96 0198 Rev V March 2012 2012 Haas Automation Inc ...
Страница 2: ......