Preparing for installation
WARNING!
Install the AP under the guidance of technical engineers and read this chapter carefully before
installation.
Examining the installation site
Examine the installation site before installation to ensure that the AP will work in a good
environment.
Installation site selection
The installation site must be selected according to the network planning and technical requirements
of telecommunications equipment, with factors such as climate, hydrology, geology, earthquake,
electric power, and transportation taken into consideration.
Determine the installation location by observing the following principles:
•
The AP will not be exposed to high temperature, dust, harmful gases, electromagnetic
interference sources (high power radars, radio stations, or electrical substations), unstable
voltage, heavy vibration, and loud noise.
•
The location is not water seeping, water soaking, and condensing.
•
The location is away from inflammable and explosive substances.
•
The AP uses built-in omnidirectional antennas. For the optimal coverage, make sure the
installation height does not exceed 5 m (16.40 ft) and no obstacles exist around the AP.
Temperature and humidity requirements
Table 1-1 Temperature and humidity requirements
Item
Specification
Operating temperature
–40°C to +65°C (–40°F to +149°F)
Storage temperature
–40°C to +85°C (–40°F to +185°F)
Operating humidity
0% RH to 100% RH, noncondensing
Storage humidity
0% RH to 100% RH, noncondensing
Power supply
You can power the AP by using a power injector. No power injector is provided with the AP. You can
use an H3C power injector. See "
Connecting the AP to a power injector
" for the connection method.