7
Installation accessories
Table1-5 Installation accessories
Mounting bracket
for the F100-C-G3,
F100-S-G3, and
F100-M-G3
Mounting brackets
(including M4 shoulder
screw) for F100-A-G3,
F100-E-G3,
F1000-C-G3,
F1000-S-G3,
F1000-A-G3, and
F1000-E-G3
M4 mounting
bracket screw
M6 rack screw and
cage nut (shipped
with the
F100-C-G3,
F100-S-G3, and
F100-M-G3
firewalls and user
supplied for other
models)
Rubber feet
Grounding cable
Releasable cable tie
(user supplied)
Power cord retainer
clip
Power cord
Pre-installation checklist
Table1-6 Pre-installation checklist
Item
Requirements
Result
Installation
site
Ventilation
•
There is a minimum clearance of 100 mm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the firewall chassis.
•
A good ventilation system is available at the
installation site.
Temperature
•
Operating:
Without drives: 0°C to 45°C (32°F to 113°F)
With drives: 5°C to 40°C (41°F to 104°F)
•
Storage: –40°C to +70°C (–40°F to +158°F)
Relative humidity
•
Operating:
Without drives: 5% RH to 95% RH,
noncondensing
With drives: 10% RH to 90% RH, noncondensing
•
Storage: 5% RH to 95% RH, noncondensing
Cleanness
•
Dust concentration ≤ 3 × 10
4
particles/m
3
•
No dust on desk within three days
ESD prevention
•
The equipment, workbench, and rack are reliably
grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are at an acceptable
level.
•
Wear an ESD wrist strap and make sure it makes
good skin contact and is reliably grounded when
Содержание SecPath F100-X-G3
Страница 63: ...i Contents 1 Appendix B LEDs 1...