background image

 

 

Set the Toggle Bar in the insertion position ( See Dia. A )  Place your thumb on the Cap of the  
Activator Cable. Push the unit through the hole while pressing on the Cap. As the unit passes 
through the hole, the Toggle Bar will flip to the open position.  
 
( Dia. B )  Shows the Toggle Bar open position. 

Activating the Toggle Bar 

Dia. A 

Dia. B 

Thumb on Activator 

Cap while inserting 

Thumb pushing on  
Activator Cap  forcing 
the Toggle Bar into open 
position 

Open position 

Insertion position 

2

 

 

Содержание G-Lok

Страница 1: ...le Bar Swage Hole Plug Anchor Loop Activator Cable G Lok Part Description Main Cable 7x19 Aircraft Cable Ball Shank Stainless Steel Toggle Bar Stainless Steel Hole Plug 6061 T6 aluminum Spring Zinc Coated Stainless Steel Swage Zinc Coated Copper Return Wire 1x19 Aircraft Cable Anchor Loop Polyurethane Company Logo Hole Diameter Size Manufactured Date Batch Number Model Number ANSI Z359 1 Mark Warn...

Страница 2: ...le while pressing on the Cap As the unit passes through the hole the Toggle Bar will flip to the open position Dia B Shows the Toggle Bar open position Activating the Toggle Bar Dia A Dia B Thumb on Activator Cap while inserting Thumb pushing on Activator Cap forcing the Toggle Bar into open position Open position Insertion position 2 ...

Страница 3: ...ve unit from service if a fall has occurred Patch all holes with concrete when job is complete For use by Single User only Pregnant women and minors must not use this product Designed safe working load is 400 LBS 149 3 kg Do not exceed this weight Important Warnings This product is to be used by qualified fall protection personnel only It is to be anchored in accordance with manufacturer s require...

Страница 4: ...ill bits DO NOT USE masonry drill bits Drill a 3 4 diameter hole Drill hole in the center of core hollow Never drill hole closer than 6 to any edge or corner Always inspect a previously drilled hole for deformation Drill another proper hole if needed Inspect the unit for damage each time you use it If damage has occurred dispose of unit Make sure the Toggle Bar is activated in the open position Th...

Страница 5: ...nd ready to pull out The Toggle Bar must be in this parallel position when inserting and removing the unit Only when the unit is activated in the open position is it safe for load bearing Unit in insertion position Push the unit downwards until the Spring fully compresses pushing on Activator Cap will force the Toggle Bar into open Position Placement in Concrete Unit inserted Removal 5 ...

Страница 6: ... hole at least 1 1 2 from any edge or corner Drill a 3 4 diameter hole Drill hole in the center of core hollow Drill center of hole at least 1 1 2 from any edge or corner Always inspect a previously drilled hole make sure the hole is round and a true 3 4 diameter hole Inspect the unit for damage each time you use it If damage has occurred dispose of unit Make sure the Toggle Bar is activated in th...

Страница 7: ...s The center of the hole must be drilled at least 1 1 2 from any edge 7 Push the unit downward until the Spring fully compresses Pushing on Activator Cap will force the Toggle Bar into open position Only when the unit is activated in the open position is it safe for load bearing ...

Страница 8: ...Address Here 8 ...

Отзывы: